Procedure
1. Power down the server.
2. Disconnect the rear cabling.
3. Extend the server from the rack.
4. Release the rail latches and remove the server from the rack.
5. Place the server on a sturdy, level surface.
Remove the bezel
Procedure
1. If installed, remove the Kensington security lock.
2. Remove the bezel.
Remove the bezel
36