7.
Install the drives.
8.
Connect the drive backplane cables to the controller.
9.
Install the access panel.
10. Slide the server into the rack.
11. Connect each power cord to the server.
12. Connect each power cord to the power source.
13. Power up the server.
Installing a rear 2LFF riser cage
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
•
T-10 Torx screwdriver
•
The components included with the hardware option kit
•
The front drive bays are fully populated with 12 LFF or 24 SFF drives.
•
High performance fans are installed in all fan bays.
Procedure
1.
Power down the server.
Remove all power:
2.
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
Installing a rear 2LFF riser cage
126