Eaton Green Motion Fleet Pro Installation Manual
Eaton Green Motion Fleet Pro Installation Manual

Eaton Green Motion Fleet Pro Installation Manual

Cord replacement
Hide thumbs Also See for Green Motion Fleet Pro:

Advertisement

Green Motion chargers
Installation guide:
Green Motion™ Fleet Pro
cord replacement

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Green Motion Fleet Pro and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Eaton Green Motion Fleet Pro

  • Page 1 Green Motion chargers Installation guide: Green Motion™ Fleet Pro cord replacement...
  • Page 2: Table Of Contents

    Contents PRODUCT INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 PACKAGE CONTENTS .
  • Page 3: Product Introduction

    Installation Guide Product introduction Eaton Green Motion Fleet Pro replacement J1172 EV connector and 25-foot cord. For use with Eaton Green Motion Fleet Pro, 80 A (GMEV80CME1-WC, GMEV80CMC1-WC). Product Family Description Green Motion Fleet Pro EVCCJ1772-V80 Replacement J1772 EV connector and 25-foot cord, 80 A...
  • Page 4: Installation

    YOUR ELECTRIC UTILITY TO DISCONNECT POWER TO AN EXISTING LOADCENTER. THE LINE SIDE OF THE MAIN BREAKER IS ENERGIZED UNLESS POWER IS DISCONNECTED UPSTREAM. EATON WILL NOT ASSUME RESPONSIBILITY FOR PROPERTY DAMAGE OR PERSONAL INJURY RESULTING FROM MISUSE OF THE INFORMATION IN THIS PUBLICATION.
  • Page 5: General Reference

    . This equipment should be located at least 18 inches (460 mm) above the floor . 15” min 15” min 10” max 48” max GREEN MOTION FLEET PRO CORD REPLACEMENT www.eaton.com 15” min...
  • Page 6: A - Disconnect The Old Charging Cable

    Green Motion Fleet Pro cord replacement Ensure the power is turned OFF before starting installation. CAUTION: Disconnect the old EV charging cable STEP A-1 Open the cabinet with the key (1) . Disconnect CS and CP signal wires and unscrew the L1, L2, and ground wire .
  • Page 7: B Install The New Charging Cable

    . Close and lock the cabinet (1) . Torque specs • L1 and L2: 21 .7 lbf-in • GND: 13 .9 lbf-in Ground Installation is complete. It is safe to restore power. GREEN MOTION FLEET PRO CORD REPLACEMENT www.eaton.com...
  • Page 8 1000 Eaton Boulevard Cleveland, OH 44122 United States Eaton .com © 2024 Eaton All Rights Reserved Eaton is a registered trademark. Printed in USA Publication No . IL191032EN / XXXX All trademarks are property April 2024 of their respective owners.

This manual is also suitable for:

Evccj1772-v80

Table of Contents