Routing Of Right Hydraulic Line - Techart 097.200.840.009-01 Assembly Instructions Manual

Noselift system for 911 carrera 4/4s, 911 turbo, techart gtstreet/r all gt2, gt2 rs, techart gtstreet s/rs until my09 gt3/gt3 rs until my09 gt3/gt3 rs starting my10 cayman all boxster all
Table of Contents

Advertisement

3.3 Routing of right hydraulic line

The hydraulic lines must not be kinked or pinched. They must be routed in such
i
a way that they do not chafe against other parts, overextend or sag in any
driving or steering situation.
i
IMPORTANT: Move wheels to the straight-ahead position.
1
Install hydraulic line (1200 mm) (5)
on right TECHART lift cylinder (1)
with the supplied banjo bolt (9)
and 2 sealing washers.
Position the TECHART lift cylinder in
i
such a way that the TECHART log
points towards the brake disk (the
left TECHART lift cylinder is shown
here).
TECHART Version 07
ASSEMBLY INSTRUCTIONS
TECHART Noselift System
Fig. 06
Fig. 07
Page 16 of 50

Advertisement

Table of Contents
loading

Table of Contents