Promeba PB-420 Series User Manual page 66

Hide thumbs Also See for PB-420 Series:
Table of Contents

Advertisement

Available languages

Available languages

USER GUIDE
EN
RAIL SERIE PB-420
06 OPERATION
REV. 2023/05
SCOOP STRETCHER FASTENING
FIXING
To place the scoop stretcher, slide it upside down,
between the anchoring plate of the stretcher and the
tray until it stops against the clamping clips. Once the
contact is made, firmly tighten the stretcher until it is
anchored.
EXTRACTING
To remove the scoop stretcher, pull it firmly until it
disengages from the retaining clips. For your comfort,
we recommend that you hold the stretcher by the roller
to do more force.
SPINE BOARD FASTENING (MODELS PB4204-00000 Y PB4206-00000)
FIXING
To place the scoop stretcher, slide it upside down,
between the anchoring plate of the stretcher and the
tray until it stops against the clamping clips. Once
contact is made, firmly tighten the stretcher until it is
anchored.
To store the spinal board, it must be placed in the lower
housing and fixed using the velcro straps for this
purpose.
EXTRACTING
To remove the scoop stretcher, pull it firmly until it
disengages from the retaining clips. For your comfort,
we recommend that you hold the stretcher by the roller
to do more force.
You can remove the spinal board by undoing the velcro fastening straps.
TENSORS (PB4200-00000, PB4201-00000 Y PB4206-00000)
To adjust the tension of the drive cables, the rail has
two sets of tensioners for regulation.
Double set of tensioners located on each of the floor
fixing plates. Tighten or untighten the cables by
screwing or unscrewing the tensors
Manual operation by pedal.
66

Advertisement

Table of Contents
loading

Table of Contents