Final Heater Assembly - Brant Radiant Heaters DX2 Series Manual

Gas-fired infrared tube heater
Table of Contents

Advertisement

3.0
Installation

Final Heater Assembly

Final Heater Assembly
Chart 3.6
Tube Installation Sequence, Baffle Location and Secured Joints for Reflectors
20 Foot
30 Foot
40 Foot
50 Foot
60 Foot
70 Foot
80 Foot
Burner Control Box
w/16 in. Burner Tube
Expansion Joint on
Reflectors
Secured Joint on
Reflectors (see note)
Primary Combustion
Chamber with Clamp
*
Stainless steel clamp on 150,000 to 200,000 BTU/h models (P/N: TP-220).
*
Stainless steel clamp on 150,000 to 200,000 BTU/h models (P/N: TP-220).
*
Stainless steel clamp on 150,000 to 200,000 BTU/h models (P/N: TP-220).
*
Stainless steel clamp on 150,000 to 200,000 BTU/h models (P/N: TP-220).
*
Stainless steel clamp on 150,000 to 200,000 BTU/h models (P/N: TP-220).
NOTE: When securing joints on reflectors
which are rotated on an angle from horizontal,
secure joint only on top side of reflector to allow
for sufficient heater expansion and contraction.
0° Mounting Angle
Key
Radiant Tube
Exchanger with Clamp
Baffle Location
Secure vent material to exchanger with three #8
sheet metal screws. Seal with high temperature
silicone sealant. Do not use tube clamp.
26
DX2
Series
1° to 45° Mounting Angle

Advertisement

Table of Contents
loading

Table of Contents