Final Heater Assembly - Brant Radiant Heaters HL2 series User Manual

Gas-fired infrared tube heater
Hide thumbs Also See for HL2 series:
Table of Contents

Advertisement

HL2
Series

Final Heater Assembly

Chart 3.6
Tube Installation Sequence, Baffle Location and Secured Joints for Reflectors
20 Foot
30 Foot
40 Foot
50 Foot
60 Foot
70 Foot
Burner Control Box
w/16 in. Burner Tube
Expansion Joint on
Reflectors
Secured Joint on
Reflectors
Primary Combustion
Chamber with Clamp
Stainless steel clamp on 150,000 to 200,000 BTU/h models (P/N: TP-220).
Stainless steel clamp on 150,000 to 200,000 BTU/h models (P/N: TP-220).
Stainless steel clamp on 150,000 to 200,000 BTU/h models (P/N: TP-220).
Stainless steel clamp on 150,000 to 200,000 BTU/h models (P/N: TP-220).
3.0
Installation
NOTE: When securing joints on reflectors
which are rotated on an angle from horizontal,
secure joint only on top side of reflector to allow
for sufficient heater expansion and contraction.
0° Mounting Angle
Key
Radiant Tube
Exchanger with Clamp
Baffle Location
Secure vent material to exchanger with three #8
sheet metal screws. Seal with high temperature
silicone sealant. Do not use tube clamp.
27
Final Heater Assembly
1 to 45° Mounting Angle

Advertisement

Table of Contents
loading

Table of Contents