Final Heater Assembly - Brant Radiant Heaters DES3 Series Manual

Gas-fired infrared tube heater
Table of Contents

Advertisement

DES3
Series

Final Heater Assembly

Chart 3.6
Tube Installation Sequence, Baffle Location and Secured Joints for Reflectors
20 Foot
30 Foot
40 Foot
50 Foot
60 Foot
70 Foot
Burner Control Box with
16" Burner Tube
Primary Combustion
Chamber Tube
Secondary Aluminized Steel
Combustion Chamber
(150-200 MBH models only)
Hot-rolled Steel Radiant
Emitter Tube
Aluminized steel secondary combustion chamber location on 150-200 MBH models.
Stainless steel clamp location on 150 - 200 MBH models (P/N: TP-220).
Aluminized steel secondary combustion chamber location on 150-200 MBH models.
Stainless steel clamp location on 150 - 200 MBH models (P/N: TP-220).
Aluminized steel secondary combustion chamber location on 150-200 MBH models.
Stainless steel clamp location on 150-200 MBH models (P/N: TP-220).
Aluminized steel secondary combustion chamber location on 150-200 MBH models.
Stainless steel clamp location on 150-200 MBH models (P/N: TP-220).
3.0
Installation
NOTE: When securing joints on reflectors
which are rotated on an angle from horizontal,
secure joint only on top side of reflector to allow
for sufficient heater expansion and contraction.
0° Mounting Angle
Key
Expansion Joint on
Reflectors
Secured Joint on
Reflectors
Standard Tube Clamp
Stainless Steel Tube Clamp
(P/N: TP-220)
only - Located between 1st and 2nd 10 ft.
tube sections.
Baffle Location
27
Final Heater Assembly
1 to 45° Mounting Angle
150-200 MBH models

Advertisement

Table of Contents
loading

Table of Contents