DES3
Series
Final Heater Assembly
Important! The combustion chamber & radiant tube sections must be installed in the following order.
20 Foot
30 Foot
40 Foot
50 Foot
60 Foot
70 Foot
Burner Control Box with
16" Burner Tube
Primary Combustion
Chamber Tube
Secondary Aluminized Steel
Combustion Chamber
(150-200 MBH models only)
NOTE: Refer to Page 3, Specifications Chart to identify specific models combustion chambers.
Stainless steel clamp location on 150 - 200 MBH models (P/N: TP-220).
Aluminized steel secondary combustion chamber location on 150-200 MBH models.
Stainless steel clamp location on 150 - 200 MBH models (P/N: TP-220).
Aluminized steel secondary combustion chamber location on 150-200 MBH models.
Stainless steel clamp location on 150-200 MBH models (P/N: TP-220).
Aluminized steel secondary combustion chamber location on 150-200 MBH models.
Stainless steel clamp location on 150-200 MBH models (P/N: TP-220).
Aluminized steel secondary combustion chamber location on 150-200 MBH models.
3.0
Key
Hot-rolled Steel Radiant
Emitter Tube
Standard Tube Clamp
Stainless Steel Tube
Clamp (P/N: TP-220)
150-200 MBH models only - Located
between 1st and 2nd 10 ft. tube sections.
Baffle Location
23
Installation
•
Final Heater Assembly