Calculation table
This table is meant to show how many hours are required for a maintenance message to be displayed as a
function of the SPM (stitches per minute) speed.
For example:
Näh- und Stickstunden
Total
1'000
9.2.4 Implementation of the maintenance intervals
A servicing message appears on reaching the 3rd interval (9 million stitches) each time the machine is
switched on.
The message only disappears after resetting to zero by the technician making a service entry in the Service
Program.
9.3 Maintenance intervals
To calculate the maintenance intervals, an average sewing or embroidering speed of about 650 spm is
assumed.
9.3.1 Cleaning- and service-stitch reset
• Service entries must be made by the technician in the Service Program after maintenance or repair
work. If not, the maintenance stitches will not reset to zero.
• The same holds true for the cleaning-stitch reset.
BERNINA International AG
Total
Minuten
60'000
Maintenance interval
Stitch counter
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Seestrasse 161
CH-8266 Steckborn
DRAFT – VERSION
SPM (Stiche
Total Stiche
pro Min.)
650
39'000'000
Hour counter
3,000,000
77
6,000,000
154
9,000,000
231
12,000,000
308
15,000,000
385
18,000,000
462
21,000,000
538
24,000,000
615
27,000,000
692
30,000,000
769
33,000,000
846
36,000,000
923
39,000,000
1000
42,000,000
1077
45,000,000
1154
48,000,000
1231
51,000,000
1308
54,000,000
1385
57,000,000
1462
60,000,000
1538
Schweiz
Seite 166 von 172