GE Definium 5000 Operator's Manual page 214

X-ray system
Table of Contents

Advertisement

Result History
After QAP is complete, the system generates a test summary page. The result summary table contains
descriptive names, measured values, test specifications (LSL and/or USL) and pass/fail status.
A minimum of 25 QAP test results are maintained.
Follow this process to view the results of previous QAP tests.
1. From the left pane, press [RESULT HISTORY].
The Result History screen appears.
2. Press a test entry in the list to select it.
3. Press [SELECT].
The test details appear.
Figure 11-17 QAP Result History screen
Definium 5000 X-Ray System
Operator Manual
Chapter 11: Quality Assurance Process and Maintenance
5197809-1EN
Rev. 4 (13 February 2008)
© 2008 General Electric Company. All rights reserved.
11-10

Advertisement

Table of Contents
loading

Table of Contents