Operation Guide - Renesas RAA306012 User Manual

Solution starter kit motor control evaluation system 3-phase smart gate driver
Table of Contents

Advertisement

RAA306012 RSSK User's Manual
3.4.3

Operation Guide

3.4.3.1
Connections
Follow the procedures below to build the evaluation environment.
a. Connect the RL78/G1F Control Board with 120-degree conducting control using Hall sensors FW written on
it to the Evaluation Board.
b. Connect the Evaluation Board and the motor U, V, W, and Hall by the attached cable. (Sensorless 120-
degree conducting control requires the connections of Hall signals.)
c. Connect the power source and the Evaluation Board. (Do not supply power at this time.)
The RAA306012 RSSK includes a ferrite core to comply with the EMC Directive. Please use the ferrite core
with 2 turns as necessary.
-
+
R12UZ0128EJ0100
Rev.1.00
Nov 1, 2023
Power Source (Output: Off)
+
Motor Cable
(U: Orange line, V: White line, W: Blue line, Hall)
Motor (TG-55L-KA,24V)
Figure 3-18 Connections for Evaluation Environment
DC 24[V]/2[A] limit
Ferrite Core (2 turns)
Evaluation Board
-
RL78/G1F Control Board
Page 45 of 76
3. Usage

Advertisement

Table of Contents
loading

Table of Contents