Commissioning

27.1
Check Operation
Operate lift and assure that push button raises lift
when pushed and stops lift when released. Check
disconnect switches for cutting power to push-
buttons. Also check that overhead switch stops
lift from raising when actuated and that lift regains
power when deactivated.
Lubricate the surface of slide between
columns and slider before commissing.
It i can be applied by brushing. This can
significantly increase the service life of the
lift.
27.2
Test the hydraulic system
1.
Set the main switch to ON.
2.
Move the unloaded lift to full rise and the
bottom position several times using the Up and
Down buttons. This will completely remove any
air pockets in the hydraulic system.
3.
Press up botton to raise lift to full rise and
keep motor running for 5 seconds. Stop and
check all hose connections. Tighten or reseal
if required.
4.
Carry out a visual inspection of the hydraulic
and pneumatic system. In doing so, check all
lines, especially the couplings. No leaks must
be found.
5.
Lower the lift completely and check the
hydraulic oil level. This must also correspond
to the maximum level.
6.
Finally check that the hydraulic components
are fitted securely.
27.3
Oil bleeding
Press Up botton to raise lift about 600mm Open
cylinder bleeders approximately. 2 turns
Close bleeders when fluid streams. Press on
the down button to fully lower lift. Fill tank until it
reaches the MIN
fill-breather cap.
27.4
Checking and Adjusting Equalizer Cables
Raise lift to check equalizer cable tension. Below
carriage, grasp adjacent cables between thumb and
forefinger, with about 67N effort you should just pull
cables together Adjust at upper tie-offs.
50
mark on the tank. Replace
F
g i
5 .
1
27.5
Locking Latch Engagement Test:
Before test,please take off the cover to check the
locking latch engagement.
A)
Raise carriages past the first latch position and
then lower onto latches.
B)
Check that the latches have fully engaged
when the release switch is not depressed.
C)
Raise carriages fully off latches. Now depress
release switch and check that the latches have
fully disengaged.
D)
Install latch covers with 5/16"-18NC x 3/8" lg.
BHCS.
0496-M005-0
A
Fig. 51 Detail
A Upper cable tie o and
13mm nylon insert lock
nut.
B Lower cable tie o and
13mm nylon insert lock
nut.
B