Introduction - Atag iR 12 Installation & Servicing Instructions Manual

Open vent system
Table of Contents

Advertisement

1

Introduction

These instructions describe the functioning, installation, use and primary maintenance of ATAG central heating
boilers for the United
Kingdom.
These instructions are intended for the use of Gas Safe registed installers in connection with the installation
and putting into operation of ATAG boilers. It is advisable to read these instructions thoroughly, well in
advance of installation. Separate instructions for use are supplied with the boiler for users of ATAG central
heating boilers. ATAG is not liable for the consequences of mistakes or shortcomings which have found their
way into the installation instructions or user's manual. Further, ATAG reserves the right to alter its products
without prior notification.
When delivering the boiler, give the customer clear instructions concerning its use; present the
customer with the user's manual and warranty card.
Each boiler is fitted with an identification plate. Consult the details on this plate to verify whether the boiler is
compliant with its intended location, e.g.: gas type, power source and exhaust classification.
On completion of the installation the installer or commissioning engineer must fill out and complete the
Benchmark Commissioning Checklist found on page 53 of this manual and hand this to the customer
for future record keeping. The Benchmark Service Record must also be completed by the service agent
following each service call, and return to the customer.
4
Installation & Servicing instructions ATAG iR-Range

Advertisement

Table of Contents
loading

Table of Contents