Wall Frame - Atag iR 12 Installation & Servicing Instructions Manual

Open vent system
Table of Contents

Advertisement

8.1

Wall frame

-
Position the boiler frame against the wall using the template and a level.
- Use the level for horizontal positioning and checking the vertical position.
-
Drill 4x ø10mm holes, 60mm deep
-
Press the nylon wall plug (ø10x55mm) in the holes
-
Mount the boiler frame to wall with the 4 coach screws (ø8x60mm) using a 13mm wrench
The boiler frame allows pipe work to be installed behind the boiler.
The pipe work must be installed at least 10mm inside the front of the frame.
ATAG i-Serie template and boiler frame
12
Installation & Servicing instructions ATAG iR-Range
Figure 8.1.a

Advertisement

Table of Contents
loading

Table of Contents