Atag Premier E-SHR 15 Installation And Servicing Instructions

Atag Premier E-SHR 15 Installation And Servicing Instructions

Advertisement

These instructions to be retained by user.
CE PIN 0063AS3538

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Premier E-SHR 15 and is the answer not in the manual?

Questions and answers

Summary of Contents for Atag Premier E-SHR 15

  • Page 1 These instructions to be retained by user. CE PIN 0063AS3538...
  • Page 2 Ignition phase Burner active on central heating Burner active on hot water Fan check Distributor for UK ATAG Heating UK Ltd. Burner off when room thermostat is demanding Unit M1 Pump overrun phase for central heating Hilton Business Park Pump overrun phase for hot water...
  • Page 3: Table Of Contents

    Contents Introduction ............................ 4 Regulations ............................ 4 Description of the appliance ......................5 Scope of the supply ........................5 Mounting of the boiler ........................5 Dimensions .......................... 6 Connecting the boiler ........................8 Central heating system ......................9 Expansion vessel ....................... 10 Underfloor heating systems(plastic pipes) ................
  • Page 4: Introduction

    A copy of the Benchmark commissioning Take note of the following when maintenance or certificate must be returned to ATAG Heating UK Ltd / Total adjustments are needed: Energy Management Ltd along with the warranty registration...
  • Page 5: Description Of The Appliance

    Scope of the supply Description of the appliance The boiler is supplied ready for use. The supply kit is The ATAG Premier E-SHR boiler is a room sealed, composed as follows: condensing and modulating central heating boiler, with or Boiler with casing;...
  • Page 6: Mounting Of The Boiler

    Mounting of the boiler The boiler can be mounted practically to any wall with the suspension bracket and the included fixing equipment. The wall must be flat and of sufficient strength in order to be able to carry the boiler weight. Above the boiler there must be at least 250 mm working space in order to be able to fit a twin supply and exhaust system or a coaxial flue system.
  • Page 7 ceiling minimum of 250 mm minimum of 10 mm figure 2 dimensions (in mm) Two points are located on the back of the boiler, which can be used in situations, in which the boiler is being suspended on a frame. In addition, the dimensions of the drilling holes for fastening the boiler are shown.
  • Page 8: Connecting The Boiler

    ½ " ½ " ½ " ½ " ¾ " . t x ¾ " . t x ½ e " . t x ½ e " . t x table 2 connection diameters Connecting the boiler The boiler has the following connection pipes; E-SHR 15 The central heating pipes.
  • Page 9: Central Heating System

    6.1 Central heating system If the capacity of the boiler pump is insufficient, an extra external pump can be installed in series with the boiler. The boiler pipes can be connected to the installation by The electrical side of this external circulation pump can means of compression fittings.
  • Page 10: Expansion Vessel

    6.5 Hot water supply E-SHR 24T and 35T The ATAG Premier E-SHR 24T and 35T are fitted with a stainless steel plate exchanger for producing domestic hot water. The boiler does not have a hot water store and...
  • Page 11: Hot Water Supply E-Shr 15 And 24

    We recommend that you use a stainless steel flue gas order to avoid condensate lying in the flue system. outlet material. Using the ATAG icicle-free roof outlet prevents ice from building up on the roof outlet. The minimum gradient is 30mm/mtr. With the condensate running back to the boiler the risk of ice forming at the terminal is reduced.
  • Page 12: Air Supply

    The terminal should be located where dispersal of The terminal must not be located in a place where it is combustion products is not impeded and with due regard likely to cause a nuisance. for the damage or discolouration that might occur to For protection of combustibles, refer to IS 813 section building products in the vicinity (see fig 10).
  • Page 13: Electrical Connection

    All connections should be designed in accordance with the enclosed regulations.; Should it be necessary to change it, the mains power supply cable may only be replaced with an ATAG mains power supply cable (item No. S4477300). The ATAG room thermostat and controls must be connected to their allocated connections.
  • Page 14 Installation instructions E-SHR series page 14...
  • Page 15: Boiler Controls

    8.1 Explanation of the function keys Boiler controls Key functions from the and the extensive The boiler is provided with a fully automatic microprocessor indication are: control. This control simplifies operation by undertaking all major control functions. Initially when power to the unit is Central Heating program key, see chapter 9.1;...
  • Page 16: Filling And Venting The Boiler And Installation

    Also, if a three-way valve is present, this will be Filling and venting the boiler adjusted to the boiler and central heating installation and installation a number of times. The pump will be stopped regularly in order to allow possible present air to escape. Filling of the system is carried out in the normal way.
  • Page 17: Commissioning The Boiler

    10.3 Adjustments 10 Commissioning the boiler In the Control Tower a number of adjustments can be Before the boiler is fired, ensure that the boiler and the made. These adjustments can be fed in easily by means system are well vented and free of air. Purge the gas line of the keys on the boiler.
  • Page 18 ° 5 o l f o l f ° 0 n i l * ATAG BrainQ thermostat ° 4 Most of the adjustments which are stated in l a i ° 4 tables 7 and 8 are unnecessary when in...
  • Page 19 Installers adjustments Adjustments whereby technical knowledge is required have been classified under the installers level. Access to this level is obtained after feeding in a code, after which adjustments for user and installer are visible. For going to the “Adjustments Parameters” chapter the Mode key should be pressed once after which it is shown with the text.
  • Page 20: Isolating The Boiler

    Service chapter. Green key function After the access code has been fed in it is possible to The green key function can be used in order to activate the temporarily manually adjust the number of revolutions of factory settings. By this means the modified settings are the fan in the service chapter (table 10).
  • Page 21: Commissioning

    12 Commissioning Work on the boiler must be carried out by a competent person, (Ref: Safety Installation and Use ) using correctly calibrated instruments with current test certification. The casing is fixed by 4 quick release clamps and 5 screws (4x 1 clamp and 1 behind door). After removing the screw, unlock the clamps, now the casing can be removed.
  • Page 22: Checking The Co

    12.2 Checking the CO 13 Maintenance The CO percentage is factory-set. This has to Maintenance or changes to the unit may only be checked during check up, service and be carried out by an authorised technician. error intervalls. remove the black cover from the gas valve by means 13.1 The frequency of maintenance of unscrewing the by paint sealed screw.
  • Page 23: Maintenance Activities

    The following components require extra attention during the service procedure and when dismantling and reassenbling the burner: ensure that the orange gasket that fits around the ceramic brick has not heat hardened or perished in any way, if it has, it is essential that the gasket is replaced before continuing to reassemble the boiler.
  • Page 24: Technical Specifications

    14 Technical specifications 1 0 , ° 0 ° 0 ° 0 ° 0 ° 0 ° ° 0 ° t a l ° 0 ³ u l f ° ° 0 ° ° 0 ° 0 ³ table 12 boiler specifications Installation instructions E-SHR series page 24...
  • Page 25: Diagram Showing Various Parts Of The Boiler

    15 Diagram showing various parts of the boiler figure 16 boiler diagram (to be used in conjunction with figure 17, page 26) gas pipe flow connection central heating return connection central heating condensation pipe cold water pipe (E-SHR-T) hot water pipe (E-SHR-T) flow sensor return sensor DHW sensor (E-SHR-T)
  • Page 26 figure 17 boiler description (to be used in conjunction with figure 16, page 25) G gas pipe 1 heat exchanger 10 Control Tower A flow connection central heating 2 ignition unit 11 water filter return central heating R return connection central heating 3 fan unit 12 three-way valve C condensation pipe...
  • Page 27: Example Diagrams For Connecting The Boiler

    16 Example diagrams for connecting the boiler 16.1 Radiator installation without thermostat valves figure 18 connecting of the boiler to a radiator installation without thermostat valves 1 ATAG Premier boiler 2 expansion vessel 3 outside sensor ARV12 4 drain points...
  • Page 28: Radiator Installation With Thermostat Valves Only

    16.2 radiator installation with thermostat valves only figure 19 connecting of the boiler to a radiator installation with thermostat valves only 1 ATAG Premier boiler 2 expansion vessel 3 outside sensor ARV12 4 drain points 5 ATAG room thermostat 6 by-pass...
  • Page 29: Error Indication

    17 Error indication When detected, errors are indicated on the display. Some, of a temporary nature, will not usually result in the boiler locking out. Whilst the control system will try its utmost to prevent lockout, and may temporarily switch off the unit, any fault which could potentially damage the appliance will result in lockout.
  • Page 30: Ce-Certificate United Kingdom

    18 CE-Certificate United Kingdom Installation instructions E-SHR series page 30...
  • Page 31: Ce-Certificate Ireland

    19 CE-Certificate Ireland Installation instructions E-SHR series page 31...
  • Page 32 This renewed publication cancels all previous installation instructions. The company reserves the right to change the specifications and dimensions without prior notice E. & O. E.