Commissioning
86
10
Commissioning
10.1
Function check
Before commissioning the measuring device:
‣
Make sure that the post-installation and post-connection checks have been performed.
• "Post-installation check" checklist→ 30
• "Post-connection check" checklist → 45
10.2
Switching on the measuring device
‣
After a successful function check, switch on the measuring device.
After a successful startup, the local display switches automatically from the startup
display to the operational display.
If nothing appears on the local display or a diagnostic message is displayed, refer to
the section on "Diagnostics and troubleshooting" → 152.
10.3
Connecting via FieldCare
• For FieldCare → 67 connection
• For connecting via FieldCare → 70
• For the FieldCare → 71 user interface
10.4
Configuring the device address via software
In the "Communication" submenu the device address can be set.
Navigation
"Setup" menu → Communication → Device address
10.4.1
PROFIBUS network
At time of delivery, the measuring device has the following factory setting:
Device address
126
• To display the current device address: Device address parameter → 93
• If hardware addressing is active, software addressing is blocked → 43
10.5
Setting the operating language
Factory setting: English or ordered local language
Proline Promass I 300 PROFIBUS DP
Endress+Hauser