Installing Options And Accessories; Installing An Optional Hotsync Can Bridge Card; Figure 5-1. Hotsync Can Bridge Card - Eaton Power Xpert 9395 User And Installation Manual

Hide thumbs Also See for Power Xpert 9395:
Table of Contents

Advertisement

5 Installing options and accessories

5.1 Installing an optional HotSync CAN Bridge Card

As an option, a HotSync Controller Area Network (CAN) Bridge Card, shown in Figure 5-1, can be
installed to provide connectivity for operational mode control of a parallel system. In addition, this card
can be used to connect optional system monitoring devices, such as a Remote Monitor Panel II, a
Relay Interface Module II, or a Supervisory Contact Module II, to the UPS.

Figure 5-1. HotSync CAN Bridge Card

1
Plug-in Terminal Block J3
NOTE
Only one HotSync CAN Bridge Card can be installed in the UPS. Multiple CAN cards are not
supported in standard distributed bypass systems.
To install the card:
1. Verify the UPS system is turned off and all power sources are disconnected. See Chapter 17: "UPS
operating instructions" for shutdown instructions.
2. Unfasten the front door latch and swing the door open (see Figure 4-1 on page 31).
3. If installing interface wiring through the left interface entry conduit landing, proceed to Step 4;
otherwise, proceed to Step 6.
4. Remove one top screw and two bottom screws securing the UPS left front panel (see Figure 4-2
on page 32). Lift the panel straight up to remove it from the panel hanger bracket at the top of the
cabinet.
5. Remove the screws securing the protective cover panel covering the X-slot and remove the panel.
Retain the hardware for later use.
6. Install the HotSync CAN Bridge Card into an open X-Slot communication bay on the front of the
UPS. See Figure 4-9 on page 44 and Figure 4-13 on page 50 for X-Slot communication bay
locations.
P-164000477
Revision 002
9395P750 kVA / 900 kVA and 1000 kVA / 1100 kVA
User's and Installation Guide
1
69

Advertisement

Table of Contents
loading

Table of Contents