Curtis G3 Gemini IntelliFresh GEMTIF10A2000 User Manual page 9

Coffee brewing system
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS
19 If the UCM is not already lit, push the ON/OFF button
to the correct volume, the heating elements will turn
on automatically. Depending on the incoming water
water tank typically requires 20 to 30 minutes to
the water has heated, "Ready to Brew" should be on
the display.
20
ml of hot water through the hot water faucet to help
purge air from the tubing inside the brewer.
21 Brew a cycle of at least 12 oz./350 ml, to purge any
remaining air from the tubing. See OPERATING
INSTRUCTIONS. During the initial brew cycle and
water tank.
II1
D

Advertisement

Table of Contents
loading

Table of Contents