7.9.6
Connecting "Inverter Off"
Connect the Powador-protect (only in the case of 380/400V
blueplanet 87.0TL3 / 92.0TL3)
↻ The cable to the external grid protection device is available on the device.
↻ Cover of the device has been opened.
1. Loosen the cable fittings [ W_19]
2. Thread the connection cables through the cable fittings.
3. Connect wire A (+) to the terminal marked "INV OFF+" on the first device via the
"DO1" terminal of the protective device.
4. Connect wire B (-) to the terminal marked "INV OFF-" on the first device via the
"GND" terminal of the protective device.
5. Connect the other devices to one another as follows:
- Wire A (+) to wire A (+) and wire B (-) to wire B (-).
6. Tighten cable fitting [ W_20 /
7. After commissioning: Configure the external Overvoltage protection
Powador-protect in the menu entry Properties / Functions Features /
Functions.
Connecting the 3rd party device
↻ The cable to the external grid protection device is available on the device.
↻ Cover of the device has been opened.
1. Loosen the cable fittings [ W_20]
2. Thread the connection cables through the cable fittings.
3. Connect wire A (+) from "COM" (11) on the terminal of the protective device to
the terminal marked "INV OFF+" on the first device.
4. Connect wire B (+) from "NC" (12) on the terminal of the protective device to
the terminal marked "INV OFF-" on the first device.
5. Connect the other devices to one another as follows:
- Wire A (+) to wire A (+) and wire B (-) to wire B (-).
6. Tighten cable fitting [ W_20 /
7. After commissioning: Configure the external Overvoltage protection exter-
nal device in the menu entry Properties / Functions Features / Functions.
7.10

Sealing the connection area

↻ Grid connection is prepared.
1. Lift the housing cover onto the housing and loosely tighten the fastening screws.
2. Secure the housing cover (1) by tightening all 6 screws (2) in a diagonally oppo-
site sequence [ T_25/
ð The device has been mounted and installed.
ð Put the device into operation.
KACO blueplanet 110 TL3 KACO blueplanet 125 TL3
13,27 In-Ibs ]
13,27 In-Ibs ].
44.25 In-Ibs ].
Installation | 7
x
RS485
A
B
A
B
GND
GND
2
1
A
x
y
RS485
A
B
A
B
GND
GND
Fig. 37: Connect the device to
Powador-protect
x
INV
RS485
OFF
A
B
A
B
+
GND
GND
2
1
x
A
y
INV
RS485
OFF
A
A
+
B
B
GND
GND
Fig. 38: Connecting the device to
the external grid protection device
2
Fig. 39: Closing the housing cover
Powador-
INV
protect
OFF
A
D01
GND
B
+
-
4
3
2
1
B
y
INV
OFF
INV Signal
-
+
External
device
A
14 NO
11 COM
12 NC
B
-
24
21
22
y
B
min./ max.
10-24V(+/-20%)
/15mA-1A
INV OFF
-
INV ON
Activ-Low signal
is required for
switching off
1