SPX Radiodetection SENSORS & SOFTWARE LMX150 Operation Manual page 22

Ground penetrating radar
Table of Contents

Advertisement

From the main menu, select the project number to work in. Projects that contain data are in red
color, whereas those with no data are in green. As you change projects, the main screen will
also display the number of lines and grids collected in each project. These will appear under the
Line Scan and Grid Scan buttons respectively.
3.2 Shutting Down
To power down, press the red power button on the display unit once. A confirmation message
will appear, after which you can press Yes to proceed. If necessary, a hard shutdown can be
done by pressing and holding the red power button until the unit shuts down.
3.3 Interacting with the Display Unit
Data collection is controlled by the Display Unit. The Display Unit has embedded software to set
survey parameters and collect, display and store data.
The Display Unit offers touch screen operation, as well as a water-resistant membrane keypad
with a number of buttons that can be pressed to perform various tasks. Most operations can be
done using either the touch screen or the keypad.
Use the following table as a guide to working with the keypad on the Display Unit:
Item
Menu Buttons
4-way directional keypad
Figure 3-2: Main Screen for LMX150™ FINDAR
Description
The yellow buttons labelled 1 to 8 correspond to menu
choices that appear on the screen.
Controls Up/Down/Left/Right operations in certain menus.
22
Getting Started
®

Advertisement

Table of Contents
loading

Table of Contents