Total Gym APEXG1 Owner's Manual page 7

Table of Contents

Advertisement

4. Make sure the handles are out to the sides before you begin to
onto the top center of glideboard and begin rolling rear rollers.
SLOWLY.
BE SURE TO SUPPORT THE FRAME IN THE CENTER
TO AVOID HAVING THE PRODUCT DROP SUDDENLY
ONTO THE FLOOR OR PINCH FINGERS.
5A. Next remove plastic packing ties from the top and
bottom of the vertical column. Pull out the Spring Loaded
Pin located at the left rail (NOTE: pin shown in picture is on
left side of unit standing behind it and looking at the back of
the vertical column) to release Spring Loaded Pin. Continue
to hold pin out while performing the next step.
SPRING
LOADED
PIN
5B. Take hold of the vertical column and pull it up until it is upright.
Release the Spring Loaded Pin. You should hear it lock back into
place. (NOTE: pin shown in picture is on left side of unit standing
behind it and looking at the back of the vertical column).
IMPORTANT: Be sure the Spring Loaded Pin is locked into place
before using your unit. You will know the pin is locked into place
when you can see the end protrude through the inside of the
rail bracket.
HOLD HERE WHILE
LOWERING TO
THE GROUND
HEIGHT ADJUSTMENT
QUICK RELEASE PIN
SPRING
LOADED
PIN
6. Position one foot on back crossbar to keep the product from
the other hand pulling the Height Adjustment Quick Release Pin
out, slide the rails along the vertical column to desired position
and release pin. Pin will lock into place—you will hear a loud
click once locked. Last, insert Safety Hitch Pin (attached with a
lanyard to the height adjustment assembly) into the hole of the
height adjustment assembly and vertical column (directly into the
opposite side of the Height Adjustment Quick Release Pin).
NOTE: Insert Safety Hitch C Pin into side hole located directly
below height adjustment assembly on vertical column.
HEIGHT ADJUSTMENT
QUICK RELEASE PIN
SPRING
LOADED PIN
SAFETY HITCH
C PIN
TOTAL GYM
// 6
®

Advertisement

Table of Contents
loading

Table of Contents