Operation; Checklist Before Operation - Redx RX Series User Manual

Hide thumbs Also See for RX Series:
Table of Contents

Advertisement

A
Do not connect the port to other power supplies. Otherwise, the inverter may be damaged,
causing risks.

6.1 Checklist Before Operation

1. Check whether the system is firmly installed, and the installation position is easy
for operation and maintenance.
2. All cables are correctly connected, properly distributed, and well protected, and no
mechanical damage is caused.
3. The selection of AC circuit breakers is correct.
4. The wiring terminals are securely installed, and the vacant terminals are sealed.
5. All safety signs and warning labels on the system are firmly and clearly visible
Rev 20230602
Figure 5.8.1 - RX-5000AC EPS connector assembly

6 Operation

B
RX - 5000AC
Page 28 of 40