Operation; Checklist Before Operation - Redx RX Series User Manual

Hybrid inverter
Hide thumbs Also See for RX Series:
Table of Contents

Advertisement

A
Figure 5.9.1 - RX-7000HY/5000HY EPS connector assembly
Do not connect the port to other power supplies. Otherwise, the inverter may be damaged,
causing risks.

6.1 Checklist Before Operation

1. Check whether the system is firmly installed, and the installation position is easy
for operation and maintenance.
2. All cables are correctly connected, properly distributed, and well protected, and no
mechanical damage is caused.
3. The selection of AC circuit breakers is correct.
4. The wiring terminals are securely installed, and the vacant terminals are sealed.
5. All safety signs and warning labels on the system are firmly and clearly visible
Rev 20230601
B

6 Operation

RX - 7000HY/5000HY
Page 29 of 41

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rx-7000hyRx-5000hy

Table of Contents