Final Adjustment And Set-Up Of Thruster Unit; Control Panel Installation - MAX power COMPACT RETRACT 12 V Mechanical And Electrical Installation Manual

Table of Contents

Advertisement

3.7

FINAL ADJUSTMENT AND SET-UP OF THRUSTER UNIT

WARNING: Please keep in mind that thruster unit will automatically retract after 10
minutes, when in "Normal Operation Mode". Thus before doing any work on the turbine,
please ensure that thruster is in "Manual Mode". When in doubt remove fuse in supply of
the electronic control box.
b) With closing plate unit fixed to the turbine, raise and lower the thruster in 'Manual Mode' to be
sure that it is closing tightly into the rebate. Once satfied make sure that closing straps are tort,
if not please adjust at the brackets located on the turbine with thruster in fully down position.
c) Once satisfied go into 'Automatic Setup Mode' during which the thruster will automatically find its
fully "Up" and fully "Down" position, after which the system will automatically shut itself off.
d) Check that the hull closing plate shuts tightly into the rebate in the hull and when fully
down that the turbine is completely clear of the hull.
e) The thruster can now be switched "On" normally and one will be able to use the thruster
in "Normal Operation Mode".
f) During the installation if you find the thruster stops prior to reaching fully "Up" or fully "Down
" position and after making sure there is no mechanical problem, one should adjust the trip
settings in the electronic control box (see electrical installation pg 20 for further detail).
4.
ELECTRICAL INSTALLATION
4.1
GENERAL ELECTRICAL INSTALLATION
ATTENTION: An incorrect electrical installation will cause rapid deterioration / failure of the unit.
Excessive voltage drops will cause relay and brush failure. Special attention should be
given to the quality, capacity and condition of your batteries, and cable sizes.
REMEMBER: Take care to tighten correctly all electrical connections.
WARNING: Under no circumstances should any inflammable products be stored next to
the electrical components of the thruster.
WARNING: It is essential to install a power fuse, manual battery isolator and if possible an
electric battery isolator as close as possible to the source of power (thruster battery bank).
The manual battery isolator must be visible, clearly marked & easily accessible.
4.2
CONTROL PANEL INSTALATION
Control panels should be protected from the natural elements while the thruster is not in use.
Install the control panel(s) in easily accessible positions, without obstructing the main engine
and/or steering controls.
When fixing the panel with the stainless steel screws, make sure to install the pre-cut rubber
seal, as supplied with the panel, ensuring that it is in the correct position.
IMPORTANT: Only clip-on the face panel/cover when totally finished and satisfied with wiring
and positioning of the unit.
10

Advertisement

Table of Contents
loading

Table of Contents