Installation; Location Of The Storage Tank; Housing Disassembly - Nibe BA-ST 9022-1FE Installation And Operating Manual

Hot water storage tank with coil
Table of Contents

Advertisement

INSTALLATION AND OPERATING MANUAL

3. INSTALLATION

3.1 Locati on of the Storage Tank
Storage tank can be installed in any room protected against
temperatures below 0 °C and convenient for the user (e.g.
in the basement, boiler room, etc.). Locati on and manner of
installati on must ensure trouble-free maintenance and servi-
cing of the unit in the future. However, we recommend in-
stallati on of the buff er tanks in the immediate vicinity of the
main heat source in order to avoid unnecessary heat losses.
Consider the fi lled tank weight when selecti ng its locati on. As
a rule, select the device locati on in a way allowing the rati onal
routi ng of both the hot water and the heati ng lines. Insulate
thoroughly all hydraulic lines and the storage tank fi tti ngs in
order to avoid any energy losses.
Informati on
When installing the storage tank, consider free space
above the unit required to maintain/replace the protec-
ti ve magnesium anode.
If space for the installati on of the magnesium bar anode
(used as standard), you can use the appropriate ti tanium
anode (that should be installed in accordance with the anode
manufacturer's instructi ons) or the appropriate magnesium
chain anode. For the specifi cati on of the protecti ve anodes
available at NIBE, see Secti on 6 Accessories and Spare Parts.
Fig. 6 Min clearance for the replacement of the protecti ve
magnesium anode.
CAUTION
For the minimum clearances to be observed when instal-
ling the storage tank, see Table 4.
6
A
min
Informati on
You can decrease the A
min
gnesium chain anode or ti tanium anode.
Fig. 7 Levelling the unit.
The storage tank stands on three feet that can be adjusted
within the range from 0 to 15 mm to level the tank.

3.2 Housing Disassembly

Removable housing with thermal insulati on facilitates trans-
port and installati on of the storage tank. Disassembly the ho-
using in the following order (see Fig. 8):
1. Remove the Temperature gauge, plug of the heati ng ele-
ment connector pipe and blanking plate of the inspecti on
opening.
2. Remove the upper cover of the housing together with
thermal insulati on.
3. Remove the plugs from the connector pipes and black
bushings.
4. Remove the fi xing screws and the strip connecti ng the
housing jacket.
5. Remove the jacket surrounding the tank (housing jacket.)
6. Remove the four-piece thermal insulati on.
Aft er the installati on of the storage tank in its fi nal locati on,
reinstall the removed components in the reverse order.
Hot Water Storage Tank with One Coil
clearance when using the ma-
0-15 mm
BA-ST 9022/9100 - 1FE

Advertisement

Table of Contents
loading

Table of Contents