Installation; Location Of The Storage Tank; Housing Disassembly - Nibe BA-ST 9030-1FEDC Installation And Operating Manual

Hot water storage tank with large surface coil
Table of Contents

Advertisement

3 Installation

Location of
the Storage Tank
Storage tank can be installed in any room protect-
ed against temperatures below 0 °C and convenient
for the user (e.g. in the basement, boiler room, etc.).
Location and manner of installation must ensure trou-
ble-free maintenance and servicing of the unit in the fu-
ture. However, we recommend installation of the buffer
tanks in the immediate vicinity of the main heat source
in order to avoid unnecessary heat losses. Consider the
fi lled tank weight when selecting its location. As a rule,
select the device location in a way allowing the rational
routing of both the hot water and the heating lines. In-
sulate thoroughly all hydraulic lines and the storage tank
fi ttings in order to avoid any energy losses.
If space for the installation of the magnesium bar an-
ode (used as standard), you can use the appropriate
titanium anode (that should be installed in accordance
with the anode manufacturer's instructions) or the ap-
propriate magnesium chain anode. For the specifi ca-
tion of the protective anodes available at NIBE, see
Section 6 Accessories and Spare Parts.
Fig. 4 Min clearance for the replacement of the pro-
tective magnesium anode.
Fig. 5 Levelling the unit.
Hot Water Storage Tank with large surface coil
BA-ST 9030 - 1FEDC
BA-ST 9040 - 1FEDC
BA-ST 9050 - 1FEDC
A
min
0 - 15 mm
The storage tank stands on three feet that can be ad-
justed within the range from 0 to 15 mm to level the
tank.
CAUTION
For the minimum clearances to be ob-
served when installing the storage tank,
see Table 3.

Housing Disassembly

Removable housing with thermal insulation facilitates
transport and installation of the storage tank. Disas-
sembly the housing in the following order (see Fig. 6):
1.
Remove the Temperature gauge, plug of the heating el-
ement connector pipe and blanking plate of the inspec-
tion opening (1).
2. Remove the upper cover of the housing together
with thermal insulation (2).
3. Remove the plugs from the connector pipes and
black bushings (3).
4. Remove the fi xing screws and the strip connect-
ing the housing jacket (4).
5. Remove the jacket surrounding the tank (housing
jacket, 5).
6. Remove the four-piece thermal insulation (6).
After the installation of the storage tank in its fi nal loca-
tion, reinstall the removed components in the reverse
order.
Chapter 3 |
Installation
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ba-st 9040-1fedcBa-st 9050-1fedc

Table of Contents