Download Print this page

Huawei LUNA2000-97KWH-1H1 Quick Manual page 33

Hide thumbs Also See for LUNA2000-97KWH-1H1:

Advertisement

3. Install cables to the COM ports.
4. Close the terminal covers of
the battery packs.
The COM cables of all models are connected in the
same way.
Cables to COM-1 on Pack1 and COM-2 on Pack12 are
reserved before delivery. After connecting the cables
to the battery packs, bind the cables inside the
cabinet. Connect the other ends of the cables after
installing the rack controller.
Other COM port cables are delivered with the
product.
The cable sequence is as follows: Pack1-2-3-4-5-6-7-
8-9-10-11-12.
The cable between Pack5 and Pack6 is 04097837-08
or 04098675-08, the cable between Pack10 and
Pack11 is 04097837-09 or 04098675-09, and the
other cables are 04097837-06 or 04098675-06.
Keep redundant cables properly for later use.
32
Rack
controller

Advertisement

loading