5.4
Installing the Rack Controller
1. Remove the decorative cover and maintenance compartment cover from the rack controller
using the delivered security Torx wrench.
2. Install short-circuiting copper bars that are delivered with the product.
Secure the copper bars using a 16 mm socket.
When installing a nut, manually insert the nut into the screw plate, and then use a socket
wrench to completely secure the nut in place. This prevents the screw thread from being
stuck or stripped due to the deviation of the nut position.
Preinstall nuts according to the recommended torque of 21 N· m.
Verify the torque of the installed nuts using a torque socket wrench set to 21 N· m.
Mark the nuts whose torque has been verified using a marker.
200 kWh Model
18