6.3
Installing Battery Pack Cables
1. Install copper bars for battery packs, and connect the battery rack general output power
cable and black start cable.
One ends of the battery rack general output power cable and black start cable are
preinstalled before delivery.
There are four types of copper bars delivered with the product: A, B, C, and D.
Copper bar D must be installed before copper bar B.
There are two types of M10 nuts for securing copper bars. Select a 15 mm or 16 mm
socket based on the site requirements.
When installing a nut, manually insert the nut into the screw plate, and then use a socket
wrench to completely secure the nut in place. This prevents the screw thread from being
stuck or stripped due to the deviation of the nut position.
Preinstall nuts according to the recommended torque of 27 N· m.
Verify the torque of the installed nuts using a torque socket wrench set to 27 N· m.
Mark the nuts whose torque has been verified using a marker.