Installation; Checks Before Unpacking; Unpacking The Unit - Air Techniques ProVecta 3D Prime Installation Instructions Manual

Hide thumbs Also See for ProVecta 3D Prime:
Table of Contents

Advertisement

Installation

EN-
7
Installation
US
NOTICE
Danger to components due to electro-
static discharge (ESD)
Establish equipotential bonding
between the person carrying out the
work and the surroundings, e.g. via a
wrist strap that is connected to the
basic unit. Here, the basic unit must be
earthed via the earth terminal.
NOTICE
Risk of equipment damage
Do not push or pull the unit during
installation by holding on to the C-
shaped arm or the handle for the
patient.
Move the unit carefully and only grip it
by the telescopic column.
7.1

Checks before unpacking

Visually inspect the packaging for damage.
Check to see if the Shockwatch display has
been activated.
WARNING
WARNING
HANDLE WITH CARE
26
Check to see if the Tiltwatch display has been
activated.
C
C
Tiltwatch
A
A
U
U
T
T
I
I
O
O
N
N
If the Shockwatch or Tiltwatch display is acti-
vated or there is damage to the packaging, do
not unpack the unit; contact the shipping com-
pany.
7.2

Unpacking the unit

The unit is supplied on a special pallet and is split
into several parts on delivery. We recommend
using two persons to transport each part individ-
ually from the delivery location to the installation
site. To ensure that the parts are still protected
during transport, do not remove the foam pack-
aging, protective films etc.
Remove the lid from the outer carton.
Remove the outer carton.
2210201032L41 2108V005

Advertisement

Table of Contents
loading

This manual is also suitable for:

Provecta 3d prime ceph

Table of Contents