Beckhoff C6025 Manual
Hide thumbs Also See for C6025:
Table of Contents

Advertisement

Quick Links

Manual | EN
C6025
Industrial PC
2023-10-09 | Version: 2.8

Advertisement

Table of Contents
loading

Summary of Contents for Beckhoff C6025

  • Page 1 Manual | EN C6025 Industrial PC 2023-10-09 | Version: 2.8...
  • Page 3: Table Of Contents

    Grounding of the Industrial PC.................. 26 4.3.2 Connecting cables and power supply ................ 27 Switching the industrial PC on and off ....................  28 5 Beckhoff Device Manager ........................ 29 6 Decommissioning ...........................  31 Disconnecting the power supply and cables ...................  31 Disassembly and disposal.......................  32 7 Maintenance ............................ 34...
  • Page 4 Table of contents 10.1 Service and support ........................ 43 10.2 Approvals ............................ 44 Version: 2.8 C6025...
  • Page 5: Notes On The Documentation

    Copyright © Beckhoff Automation GmbH & Co. KG. Publication of this document on websites other than ours is prohibited. Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of a patent, utility model or design.
  • Page 6: For Your Safety

    Exclusion of liability Beckhoff shall not be liable in the event of non-compliance with this documentation and thus the use of the devices outside the documented operating conditions.
  • Page 7: Fundamental Safety Instructions

    • the operating instructions are in good condition and complete, and always available for reference at the location where the products are used. C6025 Version: 2.8...
  • Page 8: Notes On Information Security

    For your safety Notes on information security The products of Beckhoff Automation GmbH & Co. KG (Beckhoff), insofar as they can be accessed online, are equipped with security functions that support the secure operation of plants, systems, machines and networks. Despite the security functions, the creation, implementation and constant updating of a holistic security concept for the operation are necessary to protect the respective plant, system, machine and networks against cyber threats.
  • Page 9: Product Overview

    Product overview Product overview The C6025 Industrial PC is part of the series of ultra-compact industrial PCs for space-saving control cabinet installation. It is a high-performance device with comparatively low energy consumption. It combines the compactness and fanless design of the C601x devices with the high performance of the C603x devices.
  • Page 10: Structure

    Product overview Structure Fig. 1: Structure – basic configuration Table 1: Legend C6025 structure Component Description Mounting plate Plate for mounting the industrial PC via the rear panel in the control cabinet Status LEDs Status display for UPS-OCT, power, hard disk, TwinCAT...
  • Page 11: Interface Description

    Product overview Interface description In the basic configuration, the C6025 includes the following interfaces: • Power supply (X101) • Ethernet RJ45 (X102-X104) • DisplayPort (X105) • USB (X106-X109) 3.2.1 Power supply The industrial PC is supplied with a nominal voltage of 24 V. The 2x2-pin voltage socket (X101) is used for connection to the power supply and the external wiring of the industrial PC.
  • Page 12: Ethernet Rj45

    Product overview 3.2.2 Ethernet RJ45 The C6025 has three Gigabit LAN ports (X102-X104). The 100Base-T and 1000Base-T Ethernet standards enable the connection of corresponding network components and data rates of 100/1000 Mbit/s. The required speed is selected automatically. The RJ45 connection technology with twisted-pair cables is used. The maximum length of the cable connection is 100 m.
  • Page 13: Usb

    X106 1 2 3 4 X107 X108 1 2 3 4 X109 Fig. 4: USB interface pin numbering Table 5: USB interface pin assignment Connection Vbus StdA_SSRX - StdA_SSRX + GND_DRAIN StdA_SSTX - StdA_SSTX + C6025 Version: 2.8...
  • Page 14: Displayport

    The industrial PC has a DisplayPort (X105) that enables connection of devices with DisplayPort. It facilitates transfer of image signals. In addition, DVI signals can be transferred via an adapter. Please order it from your Beckhoff sales team, quoting order identifier C9900-Z468 adapter cable DisplayPort to DVI, 40 cm.
  • Page 15: Status Leds

    The colors and flashing intervals have the following meanings: Table 7: Meaning of the UPS-OCT LED Color Flashing interval Meaning None Steadily lit No UPS-OCT connected Blue Flashing Bootloader active Yellow Flashing Moderate signal quality Green Flashing Good signal quality Flashing Poor signal quality C6025 Version: 2.8...
  • Page 16: Pwr Led

    Flashing Checksum error during the I2C transmission in the bootloader Cyan Flashing (2 s) contact Beckhoff Service 3.3.3 HDD LED The HDD LED indicates the activity of the storage medium. The colors and flashing intervals have the following meanings: Table 9: Meaning of the HDD LED...
  • Page 17: Name Plate

    The name plate provides information on the equipment fitted to the industrial PC. The name plate shown here serves only as an example. xxxxxxxx xxxxxxxxxxxx xxxxxxxxxxxx xxxxxxxxxxxx Fig. 7: Name plate Table 11: Legend C6025 name plate Description Manufacturer, including address Model: The last four digits indicate the device generation. Serial number (BTN) UPS-OCT LED Date of manufacture...
  • Page 18: Commissioning

    4. Check the contents for visible shipping damage. 5. In case of discrepancies between the package contents and the order, or in case of transport damage, please inform Beckhoff Service (see Chapter 10.1 Service and Support [} 43]). Version: 2.8 C6025...
  • Page 19: Control Cabinet Installation

    Commissioning Control cabinet installation The C6025 Industrial PC is designed for mounting in control cabinets in machine and plant engineering applications. The environmental conditions specified for operation must be observed (see chapter 9 Technical data [} 42]). Using different mounting plates, you can align the cable entry based on the application requirements.
  • Page 20: Mounting Options

    In the case of mounting plate 2, there are two different mounting options for the device. Figure 10 shows the possible mounting options: • Connections point to the right (A) • Connections point to the left (B) Fig. 10: Mounting options for mounting plate 2 Version: 2.8 C6025...
  • Page 21: Dimensions

    2 as an example. 52,5 1 00 Fig. 12: Mounting plate, side panel Fig. 13 gives an example of the dimensions using the mounting options via the rear of the device with mounting plate 3 with DIN rail adapter. C6025 Version: 2.8...
  • Page 22: Fig. 13 Mounting Plate, Din Rail Adapter

    Commissioning Fig. 13: Mounting plate, DIN rail adapter Version: 2.8 C6025...
  • Page 23: Installation In The Control Cabinet

    If you want to install the industrial PC in the control cabinet with the DIN rail adapter, no preparation of the control cabinet is necessary. All you need to do is attach the device to the DIN rail using the adapter. To do this, follow the steps below as shown in Figure 15: C6025 Version: 2.8...
  • Page 24: Fig. 15 Din Rail Adapter For Control Cabinet Installation

    3. Keep the device pressed upwards and also hook the upper side of the adapter into the DIN rail (C). ð You have successfully installed the industrial PC on the DIN rail. Fig. 16: DIN rail adapter mounted Version: 2.8 C6025...
  • Page 25: Connecting The Industrial Pc

    Devices connected to the industrial PC with their own power supply must have the same potential for the PE and "0 V" conductors as the industrial PC (no potential difference). 230 V 24 V Grounding busbar Fig. 17: Wiring example C6025 Version: 2.8...
  • Page 26: Grounding Of The Industrial Pc

    PC is installed. Use wires with a cross-section of at least 4 mm or a flat conductor for the ground connection, as the circumference of the conductor should be as large as possible. Fig. 18: Protective conductor connection PE Version: 2.8 C6025...
  • Page 27: Connecting Cables And Power Supply

    3. Screw the power supply connector to the power supply socket of the industrial PC. 4. Connect the PC to your external 24 V power supply. 5. Switch on the 24 V power supply. ð You have connected the power supply. C6025 Version: 2.8...
  • Page 28: Switching The Industrial Pc On And Off

    You then use the installation package to install the UPS software components. The UPS software components come with a detailed help function. Call up the help files either directly from the configuration register by clicking the Help button or start the file under Start > Programs > Beckhoff > UPS software components.
  • Page 29: Beckhoff Device Manager

    • User name: Administrator • Password: 1 You also have the option of using the Beckhoff Device Manager to remotely configure the industrial PC via a web browser. More detailed information is available in the Beckhoff Device Manager manual. First start Beckhoff Device Manager When your industrial PC is booted for the first time, the Beckhoff Device Manager also starts automatically for the first time.
  • Page 30: Fig. 20 Beckhoff Device Manager - Start Page

    Secure passwords Strong passwords are an important prerequisite for a secure system. Beckhoff supplies the device images with standard user names and standard passwords for the operating system. It is imperative that you change these. Controllers are shipped without a password in the UEFI/BIOS setup. Beckhoff recommends assigning a password here as well.
  • Page 31: Decommissioning

    5. Make a note of the wiring of all data transmission cables if you want to restore the cabling with another device. 6. Disconnect all data transfer cables from the industrial PC. 7. Finally, disconnect the ground connection. ð You have disconnected the cables and the power supply. C6025 Version: 2.8...
  • Page 32: Disassembly And Disposal

    2. Unhook the upper side of the adapter from the DIN rail (B). 3. Also unhook the lower side of the adapter from the DIN rail. ð You have successfully removed the industrial PC from the control cabinet. Fig. 22: Disassembly of the DIN rail adapter Version: 2.8 C6025...
  • Page 33 • Electronic parts such as fans and circuit boards must be disposed of in accordance with national electronic scrap regulations. • Stick insulating tape over the poles of the CR2032 battery on the motherboard and dispose of the battery via the local battery recycling. C6025 Version: 2.8...
  • Page 34: Maintenance

    • Only use a vacuum cleaner to clean the PC. The industrial PC does not have to be switched off for this. • Never use compressed air to clean the PC. • Maintain an ambient temperature range of 0 °C to +50 °C. Version: 2.8 C6025...
  • Page 35: Table 13 Replacement Recommendations For Pc Components

    NOTICE Use of incorrect spare parts The use of spare parts not ordered from Beckhoff Service can lead to unsafe and faulty operation. • Only use spare parts that you have ordered from Beckhoff Service. Beckhoff industrial PCs are manufactured from components of the highest quality and robustness. They are selected and tested for best interoperability, long-term availability and reliable function under the specified environmental conditions.
  • Page 36: Fig. 23 Access To Battery And Storage Media

    To do this, remove the two Torx TX6 screws and remove the cover (see fig. 22). Fig. 23: Access to battery and storage media You now have access to the battery (1) and storage medium (2) (see fig. 23). Fig. 24: Battery and storage media Version: 2.8 C6025...
  • Page 37: Replacing The Battery

    It is used to supply power to the clock integrated on the motherboard. If the battery is depleted or missing, the date and time are displayed incorrectly. Replacement batteries should only be obtained from Beckhoff Service (see Chapter 10.1 Service and support).
  • Page 38 Maintenance ð You have successfully replaced the battery. To dispose of the battery, remove it, tape off the poles and put it in the battery disposal. Version: 2.8 C6025...
  • Page 39: Replacing The Storage Media

    If you want to exchange a storage medium according to Beckhoff's recommendation, you must copy the data from the old to the new storage medium. You can use the Beckhoff Service Tool (BST) for this purpose. BST is a graphical backup and restore program for PCs with a Windows operating system. You can create an image of your operating system and use it to back up the operating system.
  • Page 40 Maintenance 2 Service and support [} 43] Version: 2.8 C6025...
  • Page 41: Troubleshooting

    Nothing happens after the Missing power supply of the Check the power supply cable Industrial PC has been switched on Industrial PC Call Beckhoff Service Other cause The Industrial PC does not boot Setup settings are incorrect Check the setup settings...
  • Page 42: Technical Data

    Technical data Technical data Table 16: Technical data Product designation C6025 Dimensions (W x H x D) 82 x 127 x 50 mm, without mounting plate Weight approx. 800 g without mounting plate approx. 900 g with mounting plate Supply voltage 22-30 V (24 V power supply unit)
  • Page 43: 10 Appendix

    33415 Verl Germany Phone: + 49 5246/963-0 email: info@beckhoff.de The addresses of the worldwide Beckhoff branches and agencies can be found on our website at http:// www.beckhoff.com/. You will also find further documentation for Beckhoff components there. C6025 Version: 2.8...
  • Page 44 FCC approvals for Canada FCC: Canadian Notice This device does not exceed the class A limits for radiation, as specified by the Radio Interference Regulations of the Canadian Department of Communications. Version: 2.8 C6025...
  • Page 45 DIN rail adapter mounted ......................Fig. 17 Wiring example ..........................Fig. 18 Protective conductor connection PE .................... Fig. 19 Beckhoff Device Manager - Change passwords ................Fig. 20 Beckhoff Device Manager – Start page ..................Fig. 21 Positions of the fastening screws....................Fig. 22 Disassembly of the DIN rail adapter.....................
  • Page 46 Table 8 Meaning of the PWR LED ......................Table 9 Meaning of the HDD LED......................Table 10 Meaning of the TC LED........................ Table 11 Legend C6025 name plate......................Table 12 Mounting plate ordering options....................Table 13 Replacement recommendations for PC components..............
  • Page 48 More Information: www.beckhoff.com/C6025 Beckhoff Automation GmbH & Co. KG Hülshorstweg 20 33415 Verl Germany Phone: +49 5246 9630 info@beckhoff.com www.beckhoff.com...

Table of Contents