Table of Contents

Advertisement

Manual | EN
C6030
Industrial PC
9/15/2021 | Version: 2.7

Advertisement

Table of Contents
loading

Summary of Contents for Beckhoff C6030

  • Page 1 Manual | EN C6030 Industrial PC 9/15/2021 | Version: 2.7...
  • Page 3: Table Of Contents

    Grounding of the Industrial PC .................. 24 4.3.2 Connecting cables and power supply ................ 25 Switching the Industrial PC on and off..................... 26 5 Beckhoff Device Manager ........................ 27 6 Decommissioning............................ 29 Disconnecting the power supply and cables ................... 29 Disassembly and disposal ....................... 30 7 Maintenance ............................. 31...
  • Page 4 Table of contents 10.1 Service and support......................... 40 10.2 Approvals............................ 41 Version: 2.7 C6030...
  • Page 5: Notes On The Documentation

    Copyright © Beckhoff Automation GmbH & Co. KG. Publication of this document on websites other than ours is prohibited. Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of a patent, utility model or design.
  • Page 6: For Your Safety

    Exclusion of liability Beckhoff shall not be liable in the event of non-compliance with this documentation and thus the use of the devices outside the documented operating conditions. Description of safety symbols The following safety symbols are used in these operating instructions.
  • Page 7: Fundamental Safety Instructions

    • the operating instructions are in good condition and complete, and always available for reference at the location where the products are used. C6030 Version: 2.7...
  • Page 8: Product Overview

    Product overview Product overview The C6030 Industrial PC is part of the series of ultra-compact Industrial PCs for space-saving control cabinet installation. It is a high-performance device. Thanks to the available processors, the Industrial PC can be used for the following applications, among others: •...
  • Page 9: Structure

    Product overview Structure Fig. 1: C6030_Structure – basic configuration Table 1: Key - C6030 structure Component Description Protective conductor connection PE Low-resistance protective earthing and functional earthing of the Industrial PC Power supply (X101) Connection of the power supply and external wiring of the Industrial PC...
  • Page 10: Interface Description

    Product overview Interface description The basic version of the C6030 has the following interfaces: • Power supply (X101) • Ethernet RJ45 (X102-X105) • USB (X106-X109) • DisplayPorts (X110, X111) 3.2.1 Power supply The Industrial PC is supplied with a rated voltage of 24 V. The 2x2-pin voltage socket (X101) is used for connection to the power supply and the external wiring of the Industrial PC.
  • Page 11: Ethernet Rj45

    Product overview 3.2.2 Ethernet RJ45 The C6030 has four Gigabit LAN ports (X102-X104). The Ethernet standards 100Base-T and 1000Base-T enable connection of corresponding network components with data rates of 100/1000 Mbit/s. The required speed is selected automatically. The RJ45 connection technology with twisted-pair cables is used. The maximum length of the cable connection is 100 m.
  • Page 12: Usb

    USB ports are switched off. X106 X107 X108 X109 USB A USB B USB C USB D Fig. 4: C6030_USB interface pin numbering Table 5: USB interface pin assignment Assignment Shield Vbus StdA_SSRX - StdA_SSRX + GND_DRAIN StdA_SSTX - StdA_SSTX + Version: 2.7 C6030...
  • Page 13: Displayport

    The Industrial PC has two DisplayPorts (X110, X111) that enable connection of devices with DisplayPort. It facilitates transfer of image signals. In addition, DVI signals can be transferred via an adapter. Please order it from your Beckhoff sales team, quoting order identifier C9900-Z468 adapter cable DisplayPort to DVI, 40 cm.
  • Page 14: Status Leds

    • the transmission quality of the UPS-OCT signals • the status of the power controller • the hard disk activity • the TwinCAT status Fig. 6: C6030 Status LEDs 3.3.1 UPS-OCT LED The UPS-OCT LED indicates the transmission quality of the UPS-OCT signals. UPS stands for the uninterruptible power supply.
  • Page 15: Pwr Led

    Flashing Checksum error during the I2C transmission in the bootloader Cyan Flashing (2 s) contact Beckhoff Service 3.3.3 HDD LED The HDD LED indicates the activity of the storage medium. The colors and flashing intervals have the following meanings: Table 9: Meaning of the HDD LED...
  • Page 16: Name Plate

    The name plate provides information on the equipment fitted to the Industrial PC. xxxxxxxx xxxxxxxxxxx xxxxxxxxxxx xxxxxxxxxxx xxxxxxxxxxx Fig. 7: C6030_Name plate Table 11: Key - C6030 name plate Description Manufacturer, including address Model: The last four digits indicate the product variant. Serial number (BTN) Date of manufacture Mainboard...
  • Page 17: Commissioning

    5. Check the contents for visible shipping damage. 6. In case of discrepancies between the package contents and the order, or in case of transport damage, please inform Beckhoff Service (see Chapter 10.1 Service and support [} 40]). C6030 Version: 2.7...
  • Page 18: Installation In The Control Cabinet

    Commissioning Installation in the control cabinet The C6030 Industrial PC is designed for installation in control cabinets in machine and plant technology. Please observe the environmental conditions prescribed for the operation (see Chapter 9 Technical data [} 39]). Using different mounting plates, you can align the cable entry based on the application requirements.
  • Page 19: Mounting Options

    PC as required to align the connections in the control cabinet. You have the following mounting options, which are shown in Fig. 10: • Connections point upwards (A) • Connections point downwards (B) • Connections point to the right (C) • Connections point to the left (D) C6030 Version: 2.7...
  • Page 20: Fig. 10: C6030 _Mounting Options For Mounting Plate 2

    Commissioning Fig. 10: C6030 _Mounting options for mounting plate 2 Version: 2.7 C6030...
  • Page 21: Dimensions

    Fig. 11 gives an example of the dimensions using the mounting option via the rear of the device with mounting plate 1. 78,6 39,1 Fig. 11: C6030 _mounting plate rear panel Fig. 12 shows the dimensions using the mounting option with the connections pointing to the right with mounting plate 2 as an example. 80,6 Fig. 12: C6030 _Mounting plate side panel...
  • Page 22: Installation In The Control Cabinet

    After you have drilled the holes for the fastening screws in the control cabinet, you can mount the Industrial PC in the control cabinet with mounting plates 1 or 2. Fig. 13: C6030 _Mounting plates for control cabinet installation To install the Industrial PC in the control cabinet, follow the steps below: 1.
  • Page 23: Connecting The Industrial Pc

    Devices connected to the Industrial PC with their own power supply must have the same potential for the PE and "0 V" conductors as the Industrial PC (no potential difference). 230 V 24 V Grounding busbar Fig. 14: C6030 _Wiring example C6030 Version: 2.7...
  • Page 24: Grounding Of The Industrial Pc

    The functional earth is necessary for the EMC of the device. The functional earthing is also established via the earthing connection between the protective conductor connection on the device and the central grounding point of the control cabinet in which the PC is installed. Version: 2.7 C6030...
  • Page 25: Connecting Cables And Power Supply

    4. Fasten the power cable to the voltage connector of the Industrial PC. 5. Connect the PC to your external 24 V power supply. 6. Switch on the 24 V power supply. 7. Measure the voltage on the power supply plug of the PC. C6030 Version: 2.7...
  • Page 26: Switching The Industrial Pc On And Off

    When you switch on the Industrial PC for the first time, the pre-installed operating system (optional) will be started. For any additional hardware you have connected, you have to install the drivers yourself afterwards. In addition, the Beckhoff Device Manager starts automatically. The Device Manager is a software from Beckhoff that supports you in configuring the PC.
  • Page 27: Beckhoff Device Manager

    • User name: Administrator • Password: 1 You also have the option of using the Beckhoff Device Manager to remotely configure the Industrial PC via a web browser. More detailed information is available in the Beckhoff Device Manager manual. First start Beckhoff Device Manager When your Industrial PC is booted for the first time, the Beckhoff Device Manager also starts automatically for the first time.
  • Page 28: Fig. 16 Beckhoff Device Manager - Start Page

    Secure passwords Strong passwords are an important prerequisite for a secure system. Beckhoff supplies the device images with standard user names and standard passwords for the operating system. It is imperative that you change these. Controllers are shipped without a password in the UEFI/BIOS setup. Beckhoff recommends assigning a password here as well.
  • Page 29: Decommissioning

    To disconnect the cables from the Industrial PC, proceed as follows: 1. Make a note of the wiring configuration, if you wish to restore it with another device. 2. Disconnect all data transfer cables from the Industrial PC. 3. Finally, disconnect the ground connection. C6030 Version: 2.7...
  • Page 30: Disassembly And Disposal

    3. Remove the PC from the control cabinet. ð You have successfully disassembled the PC. Fig. 17: C6030 _Position of the fastening screws Disposal of the Industrial PC Be sure to observe the national electronic scrap regulations when disposing of the Industrial PC.
  • Page 31: Maintenance

    Repair Only the manufacturer may repair the device. If a repair should be necessary, contact Beckhoff Service (see Chapter 10.1 Service and support). Cleaning...
  • Page 32: Table 13 Replacement Recommendations For Pc Components

    NOTE Use of incorrect spare parts The use of spare parts not ordered from Beckhoff Service can lead to unsafe and faulty operation. • Only use spare parts that you have ordered from Beckhoff Service. Beckhoff Industrial PCs are manufactured from components of the highest quality and robustness. They are selected and tested for best interoperability, long-term availability and reliable function under the specified environmental conditions.
  • Page 33: Fig. 18 C6030 _Access To Battery And Storage Media

    To do this, remove the four Torx TX10 screws and take off the cover (see Fig. 18). Fig. 18: C6030 _Access to battery and storage media You now have access to the battery (1) and storage medium (2) (see Fig. 19).
  • Page 34: Replacing The Battery

    It is used to supply power to the clock integrated on the motherboard. If the battery is depleted or missing, the date and time are displayed incorrectly. Replacement batteries should only be obtained from Beckhoff Service (see Chapter 10.1 Service and support).
  • Page 35: Replacing The Storage Media

    If you want to exchange a storage medium according to Beckhoff's recommendation, you must copy the data from the old to the new storage medium. You can use the Beckhoff Service Tool (BST) for this purpose. The BST is a graphical backup and restore program for Industrial PCs with a Windows operating system. You can create an image of your operating system and use it to back up the operating system.
  • Page 36: Fig. 22 C6030 _Replace Storage Media

    Maintenance Fig. 22: C6030 _Replace storage media 3. Insert the new SSD into the slot in the same inclined position. 4. Push down the protruding side of the SSD. 5. Replace the bolt and the fastening screw and tighten them with a tightening torque of approx. 0.3 Nm.
  • Page 37: Replacing The Fan

    • Only replace the fan with a replacement fan from Beckhoff Service. The fan ensures optimum cooling of the Industrial PC. Order a replacement fan only from Beckhoff. To do this, contact Beckhoff Service (see Chapter 10.1 Service and support).
  • Page 38: Troubleshooting

    Nothing happens after the Missing power supply of the Check the power supply cable Industrial PC has been switched on Industrial PC Call Beckhoff Service Other cause The Industrial PC does not boot Setup settings are incorrect Check the setup settings...
  • Page 39: Technical Data

    Technical data Technical data Table 16: Technical data Product designation C6030 Dimensions (W x H x D) 129 x 133 x 76 mm, without mounting plate Weight approx. 1460 g without mounting plate approx. 1700 g with mounting plate Supply voltage 20.4-30 V (24 V...
  • Page 40: Appendix

    Phone: + 49 (0) 5246/963-0 Fax: + 49 (0) 5246/963-198 e-mail: info@beckhoff.de The addresses of the worldwide Beckhoff branch offices and agencies can be found on our website at http:// www.beckhoff.com/. You will also find further documentation for Beckhoff components there.
  • Page 41: Table 17 Certifications C6030

    Appendix 10.2 Approvals The following table shows the certifications of the Industrial PC based on the device generation: Table 17: Certifications C6030 Device generation Certifications C6030-0060 CE, EAC, UKCA, FCC C6030-0070 CE, EAC, UKCA, FCC You will find all other applicable approvals on the name plate of your device.
  • Page 42 Fig. 8 C6030 _Mounting plates......................Fig. 9 C6030_Mounting options for mounting plate 1 ................Fig. 10 C6030 _Mounting options for mounting plate 2 ................Fig. 11 C6030 _mounting plate rear panel ....................Fig. 12 C6030 _Mounting plate side panel ....................
  • Page 43 Table 8 Meaning of the PWR LED......................Table 9 Meaning of the HDD LED ......................Table 10 Meaning of the TC LED ....................... Table 11 Key - C6030 name plate ......................Table 12 Mounting plate ordering options ....................Table 13 Replacement recommendations for PC components ..............
  • Page 45 More Information: www.beckhoff.com/C6030/ Beckhoff Automation GmbH & Co. KG Hülshorstweg 20 33415 Verl Germany Phone: +49 5246 9630 info@beckhoff.com www.beckhoff.com...

This manual is also suitable for:

C6030-0060C6030-0070

Table of Contents