Grounding of the Industrial PC .................. 28 4.3.2 Connecting cables and power supply ................ 29 Switching the Industrial PC on and off..................... 30 5 Beckhoff Device Manager ........................ 31 6 Decommissioning............................ 34 Disconnecting the power supply and cables ................... 34 Disassembly and disposal ....................... 35 7 Maintenance ............................. 37...
Page 4
Table of contents 8 Troubleshooting ............................ 42 9 Technical data............................ 43 10 Appendix .............................. 44 10.1 Service and support......................... 44 10.2 Approvals............................ 45 Version: 2.1 C6017...
Exclusion of liability Beckhoff shall not be liable in the event of non-compliance with this documentation and thus the use of the devices outside the documented operating conditions. Description of safety symbols The following safety symbols are used in these operating instructions.
• the operating instructions are in good condition and complete, and always available for reference at the location where the products are used. C6017 Version: 2.1...
Product overview Product overview The C6017 Industrial PC is part of the series of ultra-compact Industrial PCs for space-saving control cabinet installation. It is a high-performance device. This variant with further optional interfaces enables adaptation to specific applications and requirements.
Product overview Structure Fig. 1: C6017_Structure – basic configuration Table 1: Key - C6017 structure Component Description Mounting plate Plate for mounting the Industrial PC over the narrow sides in the control cabinet Status LEDs Status display for power, hard disk, TwinCAT...
The plug for the power supply is specified for 8 A and can accommodate cable cross-sections of up to 1.5 mm . The plug is included in the delivery. If you need a replacement connector, please contact your Beckhoff service team, quoting the order identifier C9900-P943 (see Chapter 10.1 Service and support). Version: 2.1 C6017...
Product overview 3.2.2 Ethernet RJ45 The C6017 has two Gigabit LAN ports (X102, X103). The Ethernet standards 100Base-T and 1000Base-T enable connection of corresponding network components with data rates of 100/1000 Mbit/s. The required speed is selected automatically. The RJ45 connection technology with twisted-pair cables is used. The maximum length of the cable connection is 100 m.
The Industrial PC has two USB interfaces (X105, X106). They are used to connect peripheral devices with USB interfaces. The following table shows the interface assignment based on the device generation: Table 5: USB interfaces based on device generation Generation USB interfaces C6017-0010 1x USB 2.0 (X105) 1x USB 3.0 (X106) C6017-0020 2x USB 3.0 (X105, X106) The two USB interfaces each supply up to 500 mA current and are electronically protected.
The Industrial PC has a DisplayPort (X104) that enables connection of devices with DisplayPort. It facilitates transfer of image signals. In addition, DVI signals can be transferred via an adapter. Please order it from your Beckhoff sales team, quoting order identifier C9900-Z468 adapter cable DisplayPort to DVI, 40 cm.
The Intel i210 (MAC/PHY) controller is used for both ports. The Ethernet ports are not switched. They are suitable for cycle times <= 1 ms and for distributed clock applications in EtherCAT. Fig. 7: C6017_Ethernet interface pin numbering Version: 2.1 C6017...
Request to Send Signal in Clear to Send Signal in Ring Indicator Status LEDs The Industrial PC has three status LEDs: PWR, TC, HDD. They provide information on the following aspects: • the status of the power controller C6017 Version: 2.1...
Bootloader is starting (start sequence is being run through) Magenta Flashing (0.5 s) S UPS capacitance test (if S UPS exists) Red/magenta Flashing Checksum error during the I2C transmission in the bootloader Cyan Flashing (2 s) contact Beckhoff Service Version: 2.1 C6017...
The TC LED indicates the TwinCAT status. The colors and flashing intervals have the following meanings: Table 13: Meaning of the TC LED Color Flashing interval Meaning Green Steadily lit TwinCAT Run Mode Blue Steadily lit TwinCAT Config Mode Steadily lit TwinCAT Stop TwinCAT not started C6017 Version: 2.1...
The name plate provides information on the equipment fitted to the Industrial PC. xxxxxxxx xxxxxxxxxxxxx xxxxxxxxxxxxx xxxxxxxxxxxxx xxxxxxxxxxxxx Fig. 10: C6017 _Name plate example Table 14: Key - C6017 name plate Description Manufacturer, including address Model: The last four digits indicate the device generation Serial number (BTN) Date of manufacture...
• Use only TwinCAT to control the 1-second UPS and save only persistent data with a maximum size of 1 The C6017 can optionally be ordered with internal uninterruptible power supply (UPS). This is a capacitive 1- second UPS for secure storage of persistent application data on the M.2 SSD. It requires TwinCAT and Windows Embedded Compact 7, Windows Embedded Standard 7 or Windows 10 IoT Enterprise.
4. Check the contents for visible shipping damage. 5. In case of discrepancies between the package contents and the order, or in case of transport damage, please inform Beckhoff Service (see Chapter 10.1 Service and support [} 44]). Version: 2.1 C6017...
Commissioning Installation in the control cabinet The C6017 Industrial PC is designed for installation in control cabinets in machine and plant technology. Please observe the environmental conditions prescribed for the operation (see Chapter 9 Technical data [} 43]). Using different mounting plates, you can align the cable entry based on the application requirements.
Fig. 14: • Connections point upwards (A) • Connections point downwards (B) • Connections point to the right (C) • Connections point to the left (D) Fig. 14: C6017 _Mounting options for mounting plate 2 Version: 2.1 C6017...
You have the following mounting options, which are shown in Fig. • Mounting via the rear of the device (A) • Mounting via the top of the device (B) • Mounting via the bottom of the device (C) Fig. 15: Mounting options for mounting plate 3 C6017 Version: 2.1...
Fig. 18 illustrates the dimensions using the mounting options via the rear of the device with mounting plate 3 with DIN rail adapter as an example. 65,9 81,9 32,3 47,3 Fig. 18: C6017 _Mounting plate DIN rail adapter Version: 2.1 C6017...
After you have drilled the holes for the fastening screws in the control cabinet, you can mount the Industrial PC in the control cabinet with mounting plates 1 or 2. Fig. 19: C6017 _Mounting plates for control cabinet installation To install the Industrial PC in the control cabinet, follow the steps below: 1.
3. Keep the device pressed upwards and also hook the upper side of the adapter into the DIN rail (C). ð You have successfully installed the Industrial PC on the DIN rail. Fig. 21: C6017_DIN rail adapter mounted Version: 2.1 C6017...
Set "PE" and "0 V" (24 V power supply) to the same potential (connected in the control cabinet). Connected devices that have their own power supply must have the same potential for "PE" and "GND" as the Industrial PC system (no potential difference). 230 V 24 V Grounding busbar Fig. 22: C6017 _Wiring example C6017 Version: 2.1...
The EMC of the device is improved by functional earthing. You also establish the functional earthing by connecting the PE protective conductor connection to the central grounding point of the control cabinet panel in which the PC is installed. Version: 2.1 C6017...
3. Plug the power cable into the four-pin voltage connector of the Industrial PC. 4. Fasten the power cable to the power plug of the Industrial PC. 5. Connect the PC to your external 24 V power supply. 6. Switch on the 24 V power supply. C6017 Version: 2.1...
When you switch on the Industrial PC for the first time, the pre-installed operating system (optional) will be started. For any additional hardware you have connected, you have to install the drivers yourself afterwards. In addition, the Beckhoff Device Manager starts automatically. The Device Manager is a software from Beckhoff that supports you in configuring the PC.
• User name: Administrator • Password: 1 You also have the option of using the Beckhoff Device Manager to configure the Industrial PC remotely via a web browser. More detailed information is available in the Beckhoff Device Manager manual. First start Beckhoff Device Manager When your Industrial PC is booted for the first time, the Beckhoff Device Manager also starts automatically for the first time.
To start the Beckhoff Device Manager manually, proceed as follows: 1. Open a web browser on the host PC. 2. Enter the IP address or the host name of the Industrial PC in the web browser to start the Beckhoff Device Manager.
Beckhoff Device Manager Table 16: Password generation Procedure Example Start with one or two sentences. Complex passwords are more secure Remove the spaces. Complexpasswordsaremoresecure Abbreviate words or remove all vowels. Cmplxpsswrdsrmrscr Insert numbers and special characters to extend the Cmplxpsswrdsrmrscr#529954# password.
To disconnect the cables from the Industrial PC, proceed as follows: 1. Make a note of the wiring configuration, if you wish to restore it with another device. 2. Disconnect all data transfer cables from the Industrial PC. 3. Finally, disconnect the grounding strap. Version: 2.1 C6017...
3. Remove the PC from the control cabinet. ð You have successfully disassembled the PC. Fig. 25: C6017 _Position of the fastening screws Disassembly via DIN rail adapter To remove the Industrial PC from the control cabinet via mounting plate 3 with the DIN rail adapter, follow the steps below, which are shown in Fig.
Page 36
• Send plastic parts (polycarbonate, polyamide (PA6.6)) for plastics recycling. • Take metal parts to the metal recycling collection point. • Electronic parts such as fans and circuit boards must be disposed of in accordance with national electronic scrap regulations. Version: 2.1 C6017...
Repair Only the manufacturer may repair the device. If a repair should be necessary, contact Beckhoff Service (see Chapter 10.1 Service and support). Cleaning...
NOTE Use of incorrect spare parts The use of spare parts not ordered from Beckhoff Service can lead to unsafe and faulty operation. • Only use spare parts that you have ordered from Beckhoff Service. Beckhoff Industrial PCs are manufactured from components of the highest quality and robustness. They are selected and tested for best interoperability, long-term availability and reliable function under the specified environmental conditions.
To do this, remove the two Torx TX6 screws and take off the cover (see Fig. 27). Fig. 27: C6017 _Access to battery and storage media You now have access to the battery (1) and storage medium (2) (see Fig. 28).
It is used to supply power to the clock integrated on the motherboard. If the battery is depleted or missing, the date and time are displayed incorrectly. Replacement batteries should only be obtained from Beckhoff Service (see Chapter 10.1 Service and support).
Data transfer before replacement If you want to exchange the SSD as recommended by Beckhoff, you must copy the data from the old to the new SSD. You can use the Beckhoff Service Tool (BST) for this purpose. The BST is a graphical backup and restore program for Industrial PCs with a Windows operating system.
Nothing happens after the Missing power supply of the Check the power supply cable Industrial PC has been switched on Industrial PC Call Beckhoff Service Other cause The Industrial PC does not boot Setup settings are incorrect Check the setup settings...
Technical data Technical data Table 20: Technical data Product designation C6017 Dimensions (W x H x D) 82 x 82 x 66 mm, without mounting plate Weight approx. 550 g without mounting plate approx. 610 g with mounting plate Supply voltage 20.4-30 V (24 V...
Phone: + 49 (0) 5246/963-0 Fax: + 49 (0) 5246/963-198 E-mail: info@beckhoff.de The addresses of the worldwide Beckhoff branches and agencies can be found on our website at http:// www.beckhoff.com/. You will also find further documentation for Beckhoff components there.
Appendix 10.2 Approvals The following table shows the certifications of the Industrial PC based on the device generation: Table 21: C6017 certifications Device generation Certifications C6017-0010 CE, EAC, UL C6017-0020 CE, EAC, UL FCC approvals for the United States of America...
Page 46
Fig. 12 C6017 _Mounting plates......................Fig. 13 C6017_Mounting options for mounting plate 1 ................Fig. 14 C6017 _Mounting options for mounting plate 2 ................Fig. 15 Mounting options for mounting plate 3..................Fig. 16 C6017 _Mounting plate narrow side ....................
Page 47
Table 11 Meaning of the PWR LED......................Table 12 Meaning of the HDD LED ......................Table 13 Meaning of the TC LED ....................... Table 14 Key - C6017 name plate ......................Table 15 Mounting plate ordering options ....................Table 16 Password generation ........................