Beckhoff C6025 Manual
Hide thumbs Also See for C6025:
Table of Contents

Advertisement

Quick Links

Manual | EN
C6025
Industrial PC
8/11/2021 | Version: 1.8

Advertisement

Table of Contents
loading

Summary of Contents for Beckhoff C6025

  • Page 1 Manual | EN C6025 Industrial PC 8/11/2021 | Version: 1.8...
  • Page 3: Table Of Contents

    Grounding of the Industrial PC .................. 25 4.3.2 Connecting cables and power supply ................ 26 Switching the Industrial PC on and off..................... 27 5 Beckhoff Device Manager ........................ 28 6 Decommissioning............................ 30 Disconnecting the power supply and cables ................... 30 Disassembly and disposal ....................... 31 7 Maintenance ............................. 33...
  • Page 4 Table of contents 10.2 Approvals............................ 41 Version: 1.8 C6025...
  • Page 5: Notes On The Documentation

    Copyright © Beckhoff Automation GmbH & Co. KG. Publication of this document on websites other than ours is prohibited. Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of a patent, utility model or design.
  • Page 6: For Your Safety

    Exclusion of liability Beckhoff shall not be liable in the event of non-compliance with this documentation and thus the use of the devices outside the documented operating conditions. Description of safety symbols The following safety symbols are used in these operating instructions.
  • Page 7: Fundamental Safety Instructions

    • the operating instructions are in good condition and complete, and always available for reference at the location where the products are used. C6025 Version: 1.8...
  • Page 8: Product Overview

    Product overview Product overview The C6025 Industrial PC belongs to the series of ultra-compact Industrial PCs for space-saving control cabinet installation. It is a high-performance device with comparatively low energy consumption. It combines the compactness and fanless design of the C601x devices with the high performance of the C603x devices.
  • Page 9: Structure

    Product overview Structure Fig. 1: C6025_Structure – basic configuration Table 1: Key - C6025 structure Component Description Mounting plate Plate for mounting the Industrial PC via the rear panel in the control cabinet Status LEDs Status display for UPS-OCT, power, hard disk,...
  • Page 10: Interface Description

    Product overview Interface description The basic version of the C6025 has the following interfaces: • Power supply (X101) • Ethernet RJ45 (X102-X104) • DisplayPort (X105) • USB (X106-X109) 3.2.1 Power supply The Industrial PC is supplied with a rated voltage of 24 V. The 2x2-pin voltage socket (X101) is used for connection to the power supply and the external wiring of the Industrial PC.
  • Page 11: Ethernet Rj45

    Product overview 3.2.2 Ethernet RJ45 The C6025 has three Gigabit LAN ports (X102-X104). The Ethernet standards 100Base-T and 1000Base-T enable connection of corresponding network components with data rates of 100/1000 Mbit/s. The required speed is selected automatically. The RJ45 connection technology with twisted-pair cables is used. The maximum length of the cable connection is 100 m.
  • Page 12: Usb

    X106 1 2 3 4 X107 X108 1 2 3 4 X109 Fig. 4: C6025_USB interface pin numbering Table 5: USB interface pin assignment Assignment Shield Vbus StdA_SSRX - StdA_SSRX + GND_DRAIN StdA_SSTX - StdA_SSTX + Version: 1.8 C6025...
  • Page 13: Displayport

    The Industrial PC has a DisplayPort (X105) that enables connection of devices with DisplayPort. It facilitates transfer of image signals. In addition, DVI signals can be transferred via an adapter. Please order it from your Beckhoff sales team, quoting order identifier C9900-Z468 adapter cable DisplayPort to DVI, 40 cm.
  • Page 14: Status Leds

    • the transmission quality of the UPS-OCT signals • the status of the power controller • the hard disk activity • the TwinCAT status Fig. 6: C6025 Status LEDs 3.3.1 UPS-OCT LED The UPS-OCT LED indicates the transmission quality of the UPS-OCT signals. UPS stands for the uninterruptible power supply.
  • Page 15: Pwr Led

    Flashing Checksum error during the I2C transmission in the bootloader Cyan Flashing (2 s) contact Beckhoff Service 3.3.3 HDD LED The HDD LED indicates the activity of the storage medium. The colors and flashing intervals have the following meanings: Table 9: Meaning of the HDD LED...
  • Page 16: Name Plate

    The name plate provides information on the equipment fitted to the Industrial PC. xxxxxxxx xxxxxxxxxxxx xxxxxxxxxxxx xxxxxxxxxxxx Fig. 7: C6025_Name plate Table 11: Key - C6025 name plate Description Manufacturer, including address Model: The last four digits indicate the product variant. Serial number (BTN) UPS-OCT LED...
  • Page 17: Commissioning

    5. Check the contents for visible shipping damage. 6. In case of discrepancies between the package contents and the order, or in case of transport damage, please inform Beckhoff Service (see Chapter 10.1 Service and support [} 40]). C6025 Version: 1.8...
  • Page 18: Installation In The Control Cabinet

    Commissioning Installation in the control cabinet The C6025 Industrial PC is designed for installation in control cabinets in machine and plant technology. Please observe the environmental conditions prescribed for the operation (see Chapter 9 Technical data [} 39]). Using different mounting plates, you can align the cable entry based on the application requirements.
  • Page 19: Mounting Options

    In the case of mounting plate 2, there are two different mounting options for the device. Fig. 10 shows the possible mounting options: • Connections point to the right (A) • Connections point to the left (B) Fig. 10: C6025 _Mounting options for mounting plate 2 C6025 Version: 1.8...
  • Page 20: Dimensions

    Fig. 11 gives an example of the dimensions using the mounting option via the rear of the device with mounting plate 1. 47,1 Fig. 11: C6025 _mounting plate rear panel Fig. 12 shows the dimensions using the mounting option with the connections pointing to the right with mounting plate 2 as an example.
  • Page 21: Fig. 13 C6025 _Mounting Plate Din Rail Adapter

    Commissioning Fig. 13: C6025 _Mounting plate DIN rail adapter C6025 Version: 1.8...
  • Page 22: Installation In The Control Cabinet

    After you have drilled the holes for the fastening screws in the control cabinet, you can mount the Industrial PC in the control cabinet with mounting plates 1 or 2. Fig. 14: C6025 _Mounting plates for control cabinet installation To install the Industrial PC in the control cabinet, follow the steps below: 1.
  • Page 23: Fig. 15 C6025_Din Rail Adapter For Control Cabinet Installation

    3. Keep the device pressed upwards and also hook the upper side of the adapter into the DIN rail (C). ð You have successfully installed the Industrial PC on the DIN rail. Fig. 16: C6025_DIN rail adapter mounted C6025 Version: 1.8...
  • Page 24: Connecting The Industrial Pc

    Devices connected to the Industrial PC with their own power supply must have the same potential for the PE and "0 V" conductors as the Industrial PC (no potential difference). 230 V 24 V Grounding busbar Fig. 17: C6025 _Wiring example Version: 1.8 C6025...
  • Page 25: Grounding Of The Industrial Pc

    The functional earth is necessary for the EMC of the device. The functional earthing is also established via the earthing connection between the protective conductor connection on the device and the central grounding point of the control cabinet in which the PC is installed. C6025 Version: 1.8...
  • Page 26: Connecting Cables And Power Supply

    4. Fasten the power cable to the voltage connector of the Industrial PC. 5. Connect the PC to your external 24 V power supply. 6. Switch on the 24 V power supply. 7. Measure the voltage on the power supply plug of the PC. Version: 1.8 C6025...
  • Page 27: Switching The Industrial Pc On And Off

    When you switch on the Industrial PC for the first time, the pre-installed operating system (optional) will be started. For any additional hardware you have connected, you have to install the drivers yourself afterwards. In addition, the Beckhoff Device Manager starts automatically. The Device Manager is a software from Beckhoff that supports you in configuring the PC.
  • Page 28: Beckhoff Device Manager

    • User name: Administrator • Password: 1 You also have the option of using the Beckhoff Device Manager to remotely configure the Industrial PC via a web browser. More detailed information is available in the Beckhoff Device Manager manual. Starting the Beckhoff Device Manager for the first time When your Industrial PC is booted for the first time, the Beckhoff Device Manager also starts automatically for the first time.
  • Page 29: Fig. 19 Beckhoff Device Manager - Start Page

    Secure passwords Strong passwords are an important prerequisite for a secure system. Beckhoff supplies the device images with standard user names and standard passwords for the operating system. It is imperative that you change these. Controllers are shipped without a password in the UEFI/BIOS setup. Beckhoff recommends assigning a password here as well.
  • Page 30: Decommissioning

    To disconnect the cables from the Industrial PC, proceed as follows: 1. Make a note of the wiring configuration, if you wish to restore it with another device. 2. Disconnect all data transfer cables from the Industrial PC. 3. Finally, disconnect the ground connection. Version: 1.8 C6025...
  • Page 31: Disassembly And Disposal

    3. Remove the PC from the control cabinet. ð You have successfully disassembled the PC. Fig. 20: C6025 _Position of the fastening screws Disassembly via DIN rail adapter To remove the Industrial PC from the control cabinet via mounting plate 3 with the DIN rail adapter, follow the steps below, which are shown in Fig.
  • Page 32: Fig. 21 C6025_Dismantling The Din Rail Adapter

    • Electronic parts such as fans and circuit boards must be disposed of in accordance with national electronic scrap regulations. • Stick insulating tape over the poles of the CR2032 battery on the motherboard and dispose of the battery via the local battery recycling. Version: 1.8 C6025...
  • Page 33: Maintenance

    Repair Only the manufacturer may repair the device. If a repair should be necessary, contact Beckhoff Service (see Chapter 10.1 Service and support). Cleaning...
  • Page 34: Table 13 Replacement Recommendations For Pc Components

    NOTE Use of incorrect spare parts The use of spare parts not ordered from Beckhoff Service can lead to unsafe and faulty operation. • Only use spare parts that you have ordered from Beckhoff Service. Beckhoff Industrial PCs are manufactured from components of the highest quality and robustness. They are selected and tested for best interoperability, long-term availability and reliable function under the specified environmental conditions.
  • Page 35: Fig. 22 C6025 _Access To Battery And Storage Media

    To do this, remove the two Torx TX6 screws and take off the cover (see Fig. 22). Fig. 22: C6025 _Access to battery and storage media You now have access to the battery (1) and storage medium (2) (see Fig. 23).
  • Page 36: Replacing The Battery

    It is used to supply power to the clock integrated on the motherboard. If the battery is depleted or missing, the date and time are displayed incorrectly. Replacement batteries should only be obtained from Beckhoff Service (see Chapter 10.1 Service and support).
  • Page 37: Replacing The Storage Media

    If you want to exchange a storage medium according to Beckhoff's recommendation, you must copy the data from the old to the new storage medium. You can use the Beckhoff Service Tool (BST) for this purpose. The BST is a graphical backup and restore program for Industrial PCs with a Windows operating system. You can create an image of your operating system and use it to back up the operating system.
  • Page 38: Troubleshooting

    Nothing happens after the Missing power supply of the Check the power supply cable Industrial PC has been switched on Industrial PC Call Beckhoff Service Other cause The Industrial PC does not boot Setup settings are incorrect Check the setup settings...
  • Page 39: Technical Data

    Technical data Technical data Table 16: Technical data Product designation C6025 Dimensions (W x H x D) 82 x 127 x 50 mm, without mounting plate Weight approx. 800 g without mounting plate approx. 900 g with mounting plate Supply voltage 20.4-30 V (24 V...
  • Page 40: Appendix

    Phone: + 49 (0) 5246/963-0 Fax: + 49 (0) 5246/963-198 E-mail: info@beckhoff.de The addresses of the worldwide Beckhoff branches and agencies can be found on our website at http:// www.beckhoff.com/. You will also find further documentation for Beckhoff components there.
  • Page 41: Table 17 C6025 Certifications

    Appendix 10.2 Approvals The following table shows the certifications of the Industrial PC based on the device variant: Table 17: C6025 certifications Device variant Certifications C6025-0000 CE, EAC, UL FCC approvals for the United States of America FCC: Federal Communications Commission Radio Frequency Interference Statement This device was tested and complies with the limits for a digital device of class A, according part 15 of the FCC regulations.
  • Page 42 C6025 _Mounting plates......................Fig. 9 C6025_Mounting options - mounting plates 1 and 3 ..............Fig. 10 C6025 _Mounting options for mounting plate 2 ................Fig. 11 C6025 _mounting plate rear panel ....................Fig. 12 C6025 _Mounting plate side panel ....................
  • Page 43 Table 8 Meaning of the PWR LED......................Table 9 Meaning of the HDD LED ......................Table 10 Meaning of the TC LED ....................... Table 11 Key - C6025 name plate ......................Table 12 Mounting plate ordering options ....................Table 13 Replacement recommendations for PC components ..............
  • Page 45 More Information: www.beckhoff.com/C6025/ Beckhoff Automation GmbH & Co. KG Hülshorstweg 20 33415 Verl Germany Phone: +49 5246 9630 info@beckhoff.com www.beckhoff.com...