Unpacking And Checking; Assembling, Installation And Levelling; Mains Connection - KERN CKE 6K0.02 Operating Instructions Manual

Hide thumbs Also See for CKE 6K0.02:
Table of Contents

Advertisement

Available languages

Available languages

7.2 Unpacking and checking

Remove device and accessories from packaging, remove packaging material and
install the device at the planned workplace. Check if that there has been no damage
and that all items of delivery scope are present.
Scope of delivery / serial accessories:
• Balance, see chap. 3.1
• Mains adapter
• Operating instructions
• Protective hood
• Flush-mounted hook

7.3 Assembling, Installation and Levelling

 Remove transportation lock on the lower side of the balance (models with small
housing only)
 Install weighing plate and wind shield if necessary.
 Ensure that the balance is installed in a level position.
 Level balance with foot screws until the air bubble of the water balance is in the
prescribed circle.
 Check levelling regularly

7.4 Mains connection

Select a country-specific power plug and insert it in the mains adapter.
Check, whether the voltage acceptance on the scales is set correctly. Do
not connect the scales to the power mains unless the information on the
scales (sticker) matches the local mains voltage.
Only use KERN original mains adapter. Using other makes requires
consent by KERN.
Important:
Before starting your weighing balance, check the mains cable for
damage.
Ensure that the power unit does not come into contact with liquids.
Ensure access to mains plug at all times.
14
TCKE-A/-B-BA-def-2333

Advertisement

Table of Contents
loading

Table of Contents