Unpacking And Checking; Assembling, Installation And Levelling; Mains Connection - KERN PCJ Series Operating Instructions Manual

Precision balance
Table of Contents

Advertisement

7.2 Unpacking and checking

Remove device and accessories from packaging, remove packaging material and in-
stall the device at the planned workplace. Check if that there has been no damage
and that all items of delivery scope are present.
Scope of delivery / serial accessories:
• Balance, see chap. 3.1
• Mains adapter
• Operating instructions
• Protective cover
• Underfloor weighing hook

7.3 Assembling, Installation and Levelling

 Remove the transport locks on the underside of the scale.
 Install weighing plate and wind shield if necessary.
 Ensure that the balance is installed in a level position.
 Level balance with foot screws until the air bubble of the water balance is in the
prescribed circle.
 Check levelling regularly

7.4 Mains connection

Select a country-specific power plug and insert it in the mains adapter.
Check, whether the voltage acceptance on the scales is set correctly. Do
not connect the scales to the power mains unless the information on the
scales (sticker) matches the local mains voltage.
Only use KERN original mains adapter. Using other makes requires con-
sent by KERN.
Important:
TPCJ-BA-e-2310
Before starting your weighing balance, check the mains cable for
damage.
Ensure that the power unit does not come into contact with liquids.
Ensure access to mains plug at all times.
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tpcj-a

Table of Contents