Graco Dyna-Star 77X202 Instructions Manual page 6

Pump system
Table of Contents

Advertisement

Warnings
Typical Installation
Systems with Fill Valve in the Refilling Line
The installation shown is only a guide for selecting and installing system components. Contact your Graco distributor
for assistance in planning a system to suit your needs.
NOTE: The remote filling station pump stalls (dead-heads) when the reservoir is full. If the pump does not stall
(dead-head) there is a leak in the system.
P
R
F
. 2
IG
Key:
P
Pump - remote filling station
R
Reservoir - remote filling station
V
Supply Hose
W
Pressure Relief Line
Y
Instruction Label
Z
Fill Valve
Z1 Pressure Relief Knob
AA Refilling Line
BB Filter
NOTE: The components highlighted in F
unique features in a Fill Valve installation. See Typical Installa-
tion on page 4 for a complete list of the other system compo-
nents.
6
Y
AA
BB
 Install the fill valve (Z) in an easily accessible location
between the remote fill station pump (P) and Auto-Fill Shut Off
Valve (S).
The fill valve is used to relieve pressure in the refilling line and
to reset the Auto-Fill Shut Off.
. 2 identify the
IG
Z
Z1
W
V
3A3956C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dyna-star 77x203

Table of Contents