Preparing The Mvme187 For Installation - Motorola MVME187 Installation Manual

Risc single board computer
Table of Contents

Advertisement

Hardware Preparation and Installation

Preparing the MVME187 for Installation

3
Step
1
Install/remove jumpers on headers according
chapter and as required for your particular application.
2
ConÞgure adapters and transition modules
transition module
3
Ensure that EPROM devices are properly installed in their sockets.
3-14
Refer to the setup procedures in the manuals for your particular
chassis or system for additional details concerning the installation
of the MVME187 into a VME chassis.
Table 3-7. MVME187 Preparation Procedure
Jumpers on header J1 affect 187Bug operation as listed in
Settings. The default condition is with all eight jumpers installed
A jumper installed/removed on header J2 enables/disables the
system controller function of the MVME187.
Install jumpers on headers J7 and J8 to configure serial port 4 to
use clock signals provided by the TRXC4 and RTXC4 signal lines.
user's manuals.
Factory configuration is with two EPROMs installed for the
MVME187Bug debug monitor, in sockets XU1 and XU2.
Action
to the
Jumper Settings
according to the MVME712X
in this
Jumper

Advertisement

Table of Contents
loading

Table of Contents