Oneida Air Systems BenchTop Owner's Manual page 12

Personal dust collector
Table of Contents

Advertisement

assembly Instructions (Continued)
Install the Left and Right Vanes (F, H) to the
2
BenchTop Assembly (A):
a. Locate the lower notches on the front of
the Frame Assembly. [FIG. 2a]
b. Slide the Right Vane (H) between the
Frame Assembly (E) and Pre-Filter (D) at
an angle so that it slips under the Top Vane
(G) and settles into the lower right notch
as shown in [FIG. 2b].
c. Rotate the Right Vane (H) so that it is
vertical and perpendicular to the Top Vane
(G). Align and insert the two tabs of the
Right Vane (H) into the two corresponding
slots of the Top Vane (G). Press down
firmly so that both components clip into
position [FIG. 2c].
d. Mirror Steps a-c for the Left Vane (F) on
the other side of the Frame Assembly.
Note: Make certain the two tabs on both the Left
and Right Vane are seated securely in the slots of
the Top Vane.
10
Oneida Air Systems, Inc.
FIG. 2a
FIG. 2b
FIG. 2c

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xbz000100

Table of Contents