–
Together with an assistant, take the vehicle off the pallet.
–
Position the vehicle on a lift stand.
–
Check the vehicle and components for transport damage.
Info
The procedure in the event of transport damage is
described in the Customer Service Manual.
–
Install the shock absorber. (
402051-01
(150 EXC TPI EU)
–
Position the connector board and combination instru-
ment on the upper triple clamp.
–
Mount and tighten screws
Guideline
Remaining screws,
chassis
H02537-10
(150 XC‑W TPI US)
–
Position the combination instrument on the upper
triple clamp.
–
Mount and tighten screws
Guideline
Remaining screws,
chassis
–
Route the clutch line with the clutch master cylinder
H02538-10
toward the front between the upper and lower triple
clamps.
–
Install the fork legs. (
–
Remove screws
–
Move the handlebar supports to the desired position and
mount and tighten screws
Guideline
Screw, handle-
bar support
Info
Position the left and right handlebar supports evenly.
S01414-10
p. 23)
2
.
M6
2
with the collar bushings.
M6
p. 24)
3
and take off the handlebar supports.
3
.
M10
40 Nm (29.5 lbf ft)
SETUP 2
10 Nm
(7.4 lbf ft)
10 Nm
(7.4 lbf ft)
Loctite
®
243™
5