1.2 Rough Pre-operation Procedure

The outline procedure before operating GOT is shown.
Install GT Designer2 in the PC.
Wire for the GOT power supply.
Attach the option function board.
(Only when necessary)
When transferring data via a cable
Connect GOT and PC with a USB cable
or RS-232 cable.
Install and download the OS program,
project data installed in the PC to the GOT.
1) Install the standard monitor OS,
communication driver, extended
functions OS, option OS to GOT.
2) Download the project data created
by the PC.
Check the communication settings.
Connect the cable to GOT and the destination
connector.
Turn on the GOT power and the system of the
connection destination.
Start the monitor. (Display each screen.)
Start
Create project data.
When transferring data via the CF card
Insert the CF card in the PC.
Write the OS, project data installed
in the PC in the CF card.
1) Write the standard monitor OS,
communication driver, extended function
OS, option OS in the CF card.
2) Write the project data created
by the PC in the CF card.
Install the CF card to GOT to install
and download the standard monitor OS,
communication driver, extended
function OS, option OS, project data
to the built-in flash memory.
End
Refer to GT Designer2 Version
Basic Operation/Data Transfer Manual.
Refer to GT Designer2 Version
Screen Design Manual or Help functions of
GT Designer2.
Refer to Chapter 7 WIRING.
Refer to Chapter 8 OPTION.
Refer to GT Designer2 Version
Basic Operation/Data Transfer Manual.
Refer to 16. INSTALLATION OF
core OS, BOOTOS AND STANDARD
MONITOR OS in this manual for the
operations of GOT.
Refer to GOT1000 Series Connection Manual.
1.2 Rough Pre-operation Procedure
1
2
3
4
5
6
7
8
1 - 5