Commissioning The Device; General Information On Commissioning; Switching The Device On And Off - Siemens SIMATIC IPC MD-34A Operating Instructions Manual

Hide thumbs Also See for SIMATIC IPC MD-34A:
Table of Contents

Advertisement

Commissioning the device

4.1

General information on commissioning

NOTICE
Risk of damage to the device!
Make sufficient allowances for the device to warm up to room temperature before you put it
into use. If condensation develops, wait at least 12 hours before switching on the device.
Requirements for commissioning
• The power supply is connected or the battery is fully charged.
4.2

Switching the device on and off

The operating system and system software of your device are preinstalled on the hard disk.
Following the initial switch on, the operating system is set up automatically on the device.
Device damage when switching on the device
If the Windows setup or startup is interrupted, or a default value in the BIOS setup is
changed, Windows will not be installed correctly or will not start completely. This damages
the device and jeopardizes the operational safety of the machine and plant.
• Do not press the power button several times in a row.
• Do not switch off the device while Windows is being set up or started. Secure the device
• Do not pull out or insert the power plug. Secure the power plug during operation.
• Do not change the default values in the BIOS setup.
• Do not touch the screen, buttons, or external keyboard or mouse while Windows is
40
CAUTION
to prevent accidental switch off.
starting.
Operating Instructions, 08/2023, A5E52427535-AA
4
MD-34A

Advertisement

Table of Contents
loading

Table of Contents