Lifting With Crane - Nilfisk-ALTO MC 5M Operating Instructions Manual

Table of Contents

Advertisement

Available languages

Available languages

MC 5M, MC 6P, MC 7P
4.6

Lifting with crane

16
A
D
WARNING!
Do not stand under the
machine hanging in the
air.
B
C
E
1. Before crane lifting the
machine should be in
balance. Loosen the screw
(A), push the handle (B) a
little forward.
2. When the two marks are
aligned (C), the handle is in
crane-lifting -position.
3. Be carefull to fasten the
screw (D) in the lifting
position.
4. Wrap a belt strop around
center of the handle (E)
for the crane to hook in.
Options / model variants
1)
Original instructions

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mc 6pMc 7p

Table of Contents