Rack requirements
To install the router in a rack, make sure the rack meets the following requirements:
•
The rack has a good ventilation system.
•
The rack is sturdy and can support the router and its accessories.
•
The rack has a size that can accommodate the router.
•
Enough clearances are reserved at the two sides of the router for heat dissipation.
•
A minimum of 0.8 m (2.62 ft) of clearance is reserved between the rack and walls or other
devices for heat dissipation and maintenance.
•
The headroom in the equipment room is not less than 3 m (9.84 ft).
Installation tools and accessories
Figure1-2 Installation tools
Flathead
screwdriver
ESD wrist strap
Phillips
Needle-nose
screwdriver
Diagonal pliers
Wire stripper
pliers
Heat gun
Multimeter
1-5
Network cable
tester
Marker