Installation Of Close Clearance Shields - BuckMaster 21ZC Manual

Fireplace insert & freestanding
Hide thumbs Also See for 21ZC:
Table of Contents

Advertisement

Installation of (Optional) Close Clearance Shields and Pipe Shield
1. Taking close clearance side shields, hold up to side of stove leaving 1/4" gap between shield
and top of stove.
2. Make reference mark in center of pre-punched hole in top & bottom of shield. Drill two (2)
3/32" holes in back of unit on each side. Insert self tapping screws in through shield into
stove.(SEE PICTURE BELOW)
3. Drill two (2) 3/16" holes in the sides of the stove where the shield meets the front side.
Insert two (2) 3/8" self-tapping screws. (SEE PICTURE BELOW)
4. Next loosen two (2) top screws holding side shield at rear top. Insert pipe shield where back
shield and top rear side shield meets. Leave a 1" gap from the top of stove to the pipe shield,
tighten screws.(SEE PICTURE BELOW)
Pipe Shield
Loosen these top
shield screws
Close Clearance Shields
Installation of (Optional) Pipe Shield
1" TYP.
13/16" TYP.
1/4" TYP.
Close Clearance Shields
Installation of (Optional) Close Clearance Shields
Page 35

Advertisement

Table of Contents
loading

This manual is also suitable for:

21

Table of Contents