Vertical Wall Exit Using Dvl Close Clearance Pipe ,And Elbow /Listed 2100° Ul 103 Ht Chimney And T-Box Assembly W/Out Close Clearance/Pipe Shields - BuckMaster 21ZC Manual

Fireplace insert & freestanding
Hide thumbs Also See for 21ZC:
Table of Contents

Advertisement

HOW TO LOCATE CHIMNEY EXIT AND INSTALL
Residential and Mobile Home Installation
D. Vertical Wall Exit using (6" DVL Close Clearance Pipe and Elbow and any Listed
2100° UL HT chimney and Listed 2100° UL HT T-Box assembly).
Without optional close clearance shield and pipe shield.
NOTE: For minimum clearances (See Page 24, Figure 21).
1. Mark the plumb line on wall directly behind center of heater.
(See Page 24, Figure 22).
NOTE: When using DVL Close Clearance Pipe, maintain manufacturer's minimum
clearances between pipe and ceiling.
2. Place vertical portion of heater pipe and elbow in position and project a point onto plumb
line level with center of elbow.
3. Measure up so there will be at least 1/4" rise per foot of horizontal connector pipe,
maintaining clearances to ceiling as noted in (Page 24,Figure 22). This will give you
center of hole for chimney penetration.
4. After locating center of penetration, install the tee-box and chimney, as per chimney
manufacturer's specifications.
5. Connect the DVL close clearance pipe to tee-box, per manufacturer's instructions,
DVL close clearance pipe is to be connected with (3) sheet metal screws or rivets to
connector collar on heater (See Page 24,Figure 22).
6. NOTE: If your local code requires outside air for residential installation, refer to pages
13-14 for outside air installation.
Page 23

Advertisement

Table of Contents
loading

This manual is also suitable for:

21

Table of Contents