5.2.10 Maintenance Timer Alarm - Mitsubishi Electric FR-CC2-H315K Instruction Manual

Table of Contents

Advertisement

NOTE
• When the converter unit is mounted with two or more cooling fans, "FN" is displayed even only one of the fans is detected.
• Changing the terminal assignment using Pr.190 to Pr.195 (Output terminal function selection) may affect the other
functions. Set parameters after confirming the function of each terminal.
• For replacement of each part, contact the nearest Mitsubishi Electric FA center.

5.2.10 Maintenance timer alarm

The Maintenance timer (Y95) signal is output when the converter unit's cumulative energization time reaches the time period
set with the parameter. MT1, MT2 or MT3 is displayed on the operation panel. This can be used as a guideline for the
maintenance time of peripheral devices.
Pr.
503
Maintenance timer 1
E710
504
Maintenance timer 1
E711
warning output set time
686
Maintenance timer 2
E712
687
Maintenance timer 2
E713
warning output set time
688
Maintenance timer 3
E714
689
Maintenance timer 3
E715
warning output set time
First power
9998
(999800h)
Maintenance
timer1
(Pr.503)
Y95 signal
MT1 display
Operation example of the maintenance timer 1 (Pr.503, Pr.504) (with both MT2 and MT3 OFF)
• The cumulative energization time of the converter unit is stored in the EEPROM every hour and displayed in Pr.503
(Pr.686, Pr.688) in 100 hours increments. The number indication on Pr.503 (Pr.686, Pr.688) stops at 9998 (999800 hours).
• When the value in Pr.503 (Pr.686, Pr.688) reaches the time (100 h increments) set in Pr.504 (Pr.687, Pr.689), the
Maintenance timer (Y95) signal is output, and also "
displayed on the operation panel.
• For the terminal used for the Y95 signal output, assign the function by setting "95" (positive logic) or "195" (negative logic)
in any parameter from Pr.190 to Pr.195 (Output terminal function selection).
NOTE
• The Y95 signal turns ON when any of MT1, MT2 or MT3 is activated. It does not turn OFF unless all of MT1, MT2 and MT3
are cleared.
• If all of MT1, MT2 and MT3 are activated, they are displayed in the priority of "MT1 > MT2 > MT3".
• The cumulative energization time is counted every hour. Energization time of less than 1 h is not counted.
• Changing the terminal assignment using Pr.190 to Pr.195 (Output terminal function selection) may affect the other
functions. Set parameters after confirming the function of each terminal.
94
5. PARAMETERS
5.2 (E) Environment setting parameters
Name
Initial value
0
9999
0
9999
0
9999
ON
Set "0" in Pr.503
Pr.504
OFF
ON
Setting range
Displays the converter unit's cumulative energization time in
increments of 100 hours (read-only). Writing the setting of "0"
0 (1 to 9998)
clears the cumulative energization time while Pr.503 = "1 to
9998". (Writing is disabled when Pr.503 = "0".)
Set the time until the Maintenance timer (Y95) signal is output.
0 to 9998
"MT1" is displayed on the operation panel.
9999
Function disabled.
0 (1 to 9998)
The same function as Pr.503.
0 to 9998
The same function as Pr.504.
"MT2" is displayed on the operation panel.
9999
0 (1 to 9998)
The same function as Pr.503.
0 to 9998
The same function as Pr.504.
"MT3" is displayed on the operation panel.
9999
Time
ON
" (MT1), "
Description
" (MT2), or "
" (MT3) is

Advertisement

Table of Contents
loading

Table of Contents