Energizing The System - Kodak DirectView CR 825 Installation Instructions Manual

Hide thumbs Also See for DirectView CR 825:
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS
10MAR06

Energizing the System

II4825-1
Page
28 of 72
PC
UPS
I/Test
H177_0133GCB
H177_0133GC
/TES
T
FRONT
DOOR
A
B
C
D
Bypass
/TEST
Line
On Line
On Battery
Laser Warning
This equipment uses a visible red
LASER. Prevent direct exposure to the
beam from the LASER when the system
is energized.
Dangerous Voltage
1
Energize the system.
a
Open the FRONT DOOR.
b
On the UPS, press and hold the "I/
Test" until a beep sounds.
POWER
c
Wait 5 seconds.
d
Check that the LED on the PC
illuminates and remains illuminated.
LED
e
Close the FRONT DOOR.
f
Wait for the system to initialize.
2
Energize the MONITOR.
Installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Directview cr 85056344825

Table of Contents