Installation Instructions - ADJ FOCUS SPOT 5Z User Manual

Hide thumbs Also See for FOCUS SPOT 5Z:
Table of Contents

Advertisement

I N S TA L L AT I O N I N S T R U C T I O N S
DO NOT INSTALL THE FIXTURE IF YOU ARE NOT QUALIFIED TO DO SO!
Fixture MUST be installed following all local, national, and country commercial electrical and construction
codes and regulations.
Before rigging/mounting a single fixture to any metal truss/structure or placing the fixture(s) on any
surface, a professional equipment installer MUST be consulted to determine if the metal truss/structure
or surface is properly certified to safely hold the combined weight of the fixture(s), clamps, cables, and
accessories.
Ambient operating temperature range is -13°F. (-25°C) to 113°F. (45°C).
Fixture(s) should be installed in areas outside walking paths, seating areas, or away from areas where
unauthorized personnel might reach the fixture by hand.
NEVER stand directly below the fixture(s) when rigging, removing or servicing.
Overhead fixture installation must always be secured with a secondary safety attachment, such as an
appropriately rated safety cable that can hold 10 times the weight of the fixture. Allow approximately 15
minutes for the fixture to cool down before serving.
TO MAINTAIN IP RATING INTEGRITY, ALL UNUSED CONNECTION RUBBER CAPS
MUST BE SEALED.
10

Advertisement

Table of Contents
loading

Table of Contents